Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
US 93: Twin Falls to Arco
US 93 in both directions: Road construction, paving operation, roadway reduced to two lane, look out for flagger, width limit in effect. Width limit 12'0". Expect 10 - minute delays.

Between 500 South Road and 400 South Road (3 miles north of the Twin Falls area). Road construction work is in progress. The road is being repaved. The roadway is reduced to two lanes. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 10 - minute delays. Until Monday, at about 7:00PM MDT.

Web Comment: Paving operation will commence on US-93 just north of Flying J. Single lane traffic in each direction, traffic signal will still be in operation but flaggers may also be present. Contractor: Idaho Materials and Construction 208-733-5933 Traffic Control: Idaho Traffic Control 208-455-3220

Last updated on May 20
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on US 93: Twin Falls to Arco
Map of Reports on US 93 Between 500 South Road and 400 South Road (3 miles north of the Twin Falls area). Road construction work is in progress. The road is being repaved. The roadway is reduced to two lanes. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 10 - minute delays. Until Monday, at about 7:00PM MDT. Between 300 South Road and 100 South Road (5 to 6 miles north of the Twin Falls area). There is work on the shoulder. From 6:00AM MDT to 9:00PM MDT on weekdays. Until August 28, 2020 at about 9:00PM MDT.
US 93 in both directions: Road construction, paving operation, roadway reduced to two lane, look out for flagger, width limit in effect. Width limit 12'0". Expect 10 - minute delays.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations