Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
US 20: Idaho Falls to Montana
US 20 in both directions: Bridge construction, intermittent lane closure. Width limit 14'0".

Between Exit 309: Science Drive (Idaho Falls) and Burton Road (1 mile west of the Rexburg area). Bridge construction work is in progress. A lane is closed intermittently. Width limit 14'0". Until Saturday, at about 7:00PM MDT.

Web Comment: Bridge deck rehabilitation work will require a reduction to one lane and a speed reduction. Two work zones will be active along the highway. Use of temporary crossovers will be required at times. Lane widths restricted to 14'.

Last updated on October 14
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on US 20: Idaho Falls to Montana
Map of Reports on US 20 Between Exit 309: Science Drive (Idaho Falls) and Burton Road (1 mile west of the Rexburg area). Bridge construction work is in progress. A lane is closed intermittently. Width limit 14'0". Until Saturday, at about 7:00PM MDT.
US 20 in both directions: Bridge construction, intermittent lane closure. Width limit 14'0".
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations