Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
US 93: Twin Falls to Arco
US 93 in both directions: Road construction, paving operation, roadway reduced to two lane, look out for flagger, width limit in effect. Width limit 12'0". Expect 10 - minute delays.

Between 500 South Road and 400 South Road (3 miles north of the Twin Falls area). Road construction work is in progress. The road is being repaved. The roadway is reduced to two lanes. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 10 - minute delays. Until June 8, 2020 at about 7:00PM MDT.

Web Comment: Paving operation will commence on US-93 just north of Flying J. Single lane traffic in each direction, traffic signal will still be in operation but flaggers may also be present. Contractor: Idaho Materials and Construction 208-733-5933 Traffic Control: Idaho Traffic Control 208-455-3220

Last updated on May 20
US 93 in both directions: Road construction, bridge construction, work on the shoulder, intersecting road closed, temporary traffic light, roadway reduced to one lane, look out for flagger, delay, width limit in effect. Width limit 12'0". Expect 10 - minute delays.

Between 300 South Road and 100 South Road (5 to 6 miles north of the Twin Falls area). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. The intersecting road is closed. Look out for temporary traffic lights. The roadway is reduced to one lane. Look out for flaggers. Expect delays. There is a width limit in effect. Width limit 12'0". Expect 10 - minute delays. Until today at about 7:00PM MDT.

Web Comment: Temporary traffic signals will be used for approximately 3-4 weeks due to construction on US-93. The intersection at US-93 and 200 South will also be closed to allow for construction of new turn bays. Flagger controlled, intermittent, short term, one lane closures can occur. Contractor: Idaho Materials 208-733-5933 Traffic Control: Idaho Traffic Control 208-455-3220

Last updated yesterday at 4:00pm MDT
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on US 93: Twin Falls to Arco
Map of Reports on US 93 Between 500 South Road and 400 South Road (3 miles north of the Twin Falls area). Road construction work is in progress. The road is being repaved. The roadway is reduced to two lanes. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 10 - minute delays. Until June 8, 2020 at about 7:00PM MDT. Between 300 South Road and 100 South Road (5 to 6 miles north of the Twin Falls area). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. The intersecting road is closed. Look out for temporary traffic lights. The roadway is reduced to one lane. Look out for flaggers. Expect delays. There is a width limit in effect. Width limit 12'0". Expect 10 - minute delays. Until today at about 7:00PM MDT. Between 300 South Road and 100 South Road (5 to 6 miles north of the Twin Falls area). There is work on the shoulder. From 6:00AM MDT to 9:00PM MDT on weekdays. Until August 28, 2020 at about 9:00PM MDT.
US 93 in both directions: Road construction, paving operation, roadway reduced to two lane, look out for flagger, width limit in effect. Width limit 12'0". Expect 10 - minute delays.
US 93 in both directions: Road construction, bridge construction, work on the shoulder, intersecting road closed, temporary traffic light, roadway reduced to one lane, look out for flagger, delay, width limit in effect. Width limit 12'0". Expect 10 - minute delays.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations