US 95 in both directions: Night time construction work, roadway reduced to one lane, because the road is being repaved. Width limit 14'0". Expect 15 - minute delays. Speed limit 55 MPH.

Between Butler Creek Road and Heath Lake Road (7 to 10 miles south of the Sandpoint area). Night time construction work is in progress. The roadway is reduced to one lane because the road is being repaved. Width limit 14'0". Expect 15 - minute delays. Speed limit 55 MPH. Until August 15, 2020 at about 7:00AM PDT.

Web Comment: Lane closures will occur at various locations in both directions on alternating lanes as crews work to repair failing pavement sections. Width restriction in place 7:00 pm to 7:00 am.

Last updated on July 27
US 95 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, look out for flagger, width limit in effect. Width limit 12'0". Expect 15 - minute delays.

Between Hall Mountain Road and County Road 34 (20 miles north of the Bonners Ferry area). Road construction work is in progress. The road is being repaved. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 15 - minute delays. Until October 2, 2020 at about 8:00PM PDT.

Web Comment: Full Bridge Replacement

Last updated on August 5
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on US 95: Coeur d'Alene to Canada
Map of Reports on US 95 Between I-90 (Coeur d'Alene) and Lancaster Road (Hayden). Look out for rush hour traffic. Between Kathleen Avenue (Coeur d'Alene) and Miles Avenue (Hayden). Look out for long term road construction work. Look out for temporary traffic lights. From 12:00AM PDT to 12:00AM PDT daily. Until August 28, 2020 at about 5:00PM PDT. Between Butler Creek Road and Heath Lake Road (7 to 10 miles south of the Sandpoint area). Night time construction work is in progress. The roadway is reduced to one lane because the road is being repaved. Width limit 14'0". Expect 15 - minute delays. Speed limit 55 MPH. Until August 15, 2020 at about 7:00AM PDT. Between Hall Mountain Road and County Road 34 (20 miles north of the Bonners Ferry area). Road construction work is in progress. The road is being repaved. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 15 - minute delays. Until October 2, 2020 at about 8:00PM PDT.
US 95 in both directions: Night time construction work, roadway reduced to one lane, because the road is being repaved. Width limit 14'0". Expect 15 - minute delays. Speed limit 55 MPH.
US 95 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, look out for flagger, width limit in effect. Width limit 12'0". Expect 15 - minute delays.
US 95: Bonners Ferry
Bonners Ferry Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup