Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-84: Twin Falls to I-86 Junction
I-84 in both directions: Bridge construction, roadway reduced to one lane, follow the sign, consider using an alternate route, width limit in effect. Width limit 14'0".

Between Exit 201: ID 25; Kasota Road and Exit 208: ID 27 (near Burley). Bridge construction work is in progress. The roadway is reduced to one lane. Follow the signs. Consider using an alternate route. There is a width limit in effect. Width limit 14'0". From 6:00AM MDT to 6:00PM MDT on weekdays. Until tomorrow at about 6:00PM MDT.

Web Comment: Bridge refurbishment, rebuiding approaches and replacing guardrail. Contractor: Truesdell 480-415-3991 Traffic Control: Road Work Ahead 208-734-4444 For Loads wider than 14 ft, please consider an alternate route or call the contractor for possible accommodation

Last updated on September 3
I-84 in both directions: Construction work, roadway reduced to one lane, speed restrictions in force, width limit in effect, narrow lane, drive with extreme caution. Speed limit 55 MPH. Width limit 12'0".

Between Exit 216: ID 25; ID 77 and Exit 228 (9 to 12 miles east of the Heyburn area). Look out for construction work. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Be aware of narrow lanes. Drive with extreme caution. Speed limit 55 MPH. Width limit 12'0". Until November 20, 2019 at about 6:00PM MDT.

Web Comment: Construction work on I-84 / I-86 junction (milepost 222). Lane restrictions in each direction on both routes. Two lane, two way traffic. Eastbound traffic - keep right to go to Salt Lake City, stay left to go to I-86 and Pocatello.

Last updated on September 18
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on I-84: Twin Falls to I-86 Junction
Map of Reports on I-84 Between Exit 216: ID 25; ID 77 and Exit 228 (9 to 12 miles east of the Heyburn area). Look out for construction work. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Be aware of narrow lanes. Drive with extreme caution. Speed limit 55 MPH. Width limit 12'0". Until November 20, 2019 at about 6:00PM MDT.
I-84 in both directions: Bridge construction, roadway reduced to one lane, follow the sign, consider using an alternate route, width limit in effect. Width limit 14'0".
I-84 in both directions: Construction work, roadway reduced to one lane, speed restrictions in force, width limit in effect, narrow lane, drive with extreme caution. Speed limit 55 MPH. Width limit 12'0".
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations