Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Restrictions on US 20: Mountain Home to Arco
US 20: Mountain Home to Arco

Between Blaine Road and County Line Road; Camp Creek Road (11 miles east of the Fairfield area). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. The road is being repaved. The roadway is reduced to one lane. Look out for flaggers. Expect delays. Drive carefully. Speed restrictions are in force. There is a width limit in effect. Consider using an alternate route. Expect 15 - minute delays. Speed limit 35 MPH. Width limit 14'0". From 7:00AM MST to 7:00PM MST on weekdays. Until December 19, 2019 at about 7:00PM MST.

Web Comment: Temporary traffic signals will be in place. Temporary bumps throughout work zone. Contractor is Knife River Corporation 208-362-6152

Last updated today at 10:19am MST

Between Hot Springs Landing Road and Station Crossing Road (19 to 20 miles east of the Fairfield area). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. The road is being repaved. The roadway is reduced to one lane. Expect delays. Look out for flaggers. Drive carefully. Speed restrictions are in force. There is a width limit in effect. Consider using an alternate route. Expect 15 - minute delays. Speed limit 35 MPH. Width limit 14'0". From 7:00AM MST to 7:00PM MST on weekdays. Until December 15, 2019 at about 7:00PM MST.

Web Comment: Temporary traffic signals in place. Temporary bumps throughout work zone. Contractor is Knife River Corporation 208-362-6152

Last updated today at 6:00pm MST