Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Restrictions on US 95: Payette to New Meadows
US 95: Payette to New Meadows

Between East Fork Road and Old Highway (8 miles north of the Council area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for temporary traffic lights. There is a width limit in effect. Speed restrictions are in force. Expect delays. Width limit 12'0". Speed limit 35 MPH. Expect 15 - minute delays. Until December 15, 2019 at about 7:00PM MDT.

Web Comment: Ongoing bridge construction will require a series of night-time closures throughout the summer and fall. US-95 will operate with traffic signal controlled alternating one-way traffic over the bridge and a 12-foot width restriction. Project Info

Last updated on October 17

Between Smokey Boulder Road and Hazard Creek Road (12 miles north of the New Meadows area). Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Width limit 14'0". Until November 18, 2019 at about 11:59PM MDT.

Last updated on October 10