I-15: Pocatello to Montana
I-15 in both directions: Bridge construction, right shoulder closed. Speed limit 65 MPH. Width limit 12'0".

Between Exit 72: I-86 and Exit 80: Fort Hall (near Chubbuck). Bridge construction work is in progress. The right shoulder is closed. Speed limit 65 MPH. Width limit 12'0". Until October 31, 2019 at about 5:00PM MDT.

Web Comment: Alternate lane closures Monday-Saturday, 7 AM - 5 PM may occur. Alternate Detour Route US-91 might be a consideration for motorist during peak traffic times.

Last updated on September 13
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on I-15: Pocatello to Montana
Map of Reports on I-15 Between Exit 72: I-86 and Exit 80: Fort Hall (near Chubbuck). Bridge construction work is in progress. The right shoulder is closed. Speed limit 65 MPH. Width limit 12'0". Until October 31, 2019 at about 5:00PM MDT. Between Exit 93: US 26 and Northbound Blackfoot Rest Area (1 to 3 miles north of the Blackfoot area). Road construction work is in progress. Bridge construction work is in progress. People are working in the median. Observe speed limits. Until December 2, 2019 at about 11:59PM MDT. Between Exit 167: ID 22 (Dubois) and The Montana State Line (11 miles north of the Spencer area). Road construction work is in progress. There is work on the shoulder. Until Friday, at about 11:59PM MDT.
I-15 in both directions: Bridge construction, right shoulder closed. Speed limit 65 MPH. Width limit 12'0".
Sage Junction Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup