Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 55: Marsing to Nampa
ID 55: Road construction, roadway reduced to one lane, observe signal, look out for flagger, delay, width limit in effect, intersecting road closed. Width limit 11'0". Expect 10 - minute delays.

Between ID 78 and Sunnyslope Road (near Marsing). Road construction work is in progress. The roadway is reduced to one lane. Observe the signals. Look out for flaggers. Expect delays. There is a width limit in effect. The intersecting road is closed. Width limit 11'0". Expect 10 - minute delays. Until June 15, 2020 at about 7:00PM MST.

Web Comment: Traffic has been switched to the new bridge deck (north half). Work will begin on the remaining south side of the bridge. As of 12/10/19 a new access into the park has been opened on the north side of SH-55 in addition to the existing access on the south side.

Last updated on December 11
Switch to Winter Driving Conditions
Switch to Road Reports
Restrictions on ID 55: Marsing to Nampa
Map of Reports on ID 55 Between ID 78 and Sunnyslope Road (near Marsing). Road construction work is in progress. The roadway is reduced to one lane. Observe the signals. Look out for flaggers. Expect delays. There is a width limit in effect. The intersecting road is closed. Width limit 11'0". Expect 10 - minute delays. Until June 15, 2020 at about 7:00PM MST.
ID 55: Road construction, roadway reduced to one lane, observe signal, look out for flagger, delay, width limit in effect, intersecting road closed. Width limit 11'0". Expect 10 - minute delays.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations