Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
Truck Restrictions on I-84
I-84

Between Exit 29: US 20; Franklin Road and Exit 38: I-84B; Garrity Blvd (near Nampa). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH. From 9:00PM MDT to 5:00AM MDT daily. Until January 28, 2021 at about 6:00AM MDT.

Web Comment: WIDTH LIMIT IS AT NIGHT ONLY. the width limit at night is 12'. (9 pm to 7 am) Expect night time lane closures, through the duration of the project. Wide loads use caution as shoulder widths are limited throughout the project. Shoulder widths are reduced to two (2) feet in some areas. Expect nightly lane closures on Northside Blvd in September. Flaggers may be present to control traffic on Northside.

Last updated yesterday at 6:30pm MDT

Between Exit 112: I-84B and Exit 125: 18th East Street (5 miles west of the Glenns Ferry area). Road construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Speed restrictions are in force. Speed limit 70 MPH. Width limit 14'0". Until October 30, 2020 at about 11:59PM MDT.

Web Comment: I-84 construction between Hammett and Glenns Ferry. All westbound traffic will be crossed over to eastbound I-84 in a two way traffic pattern.

Last updated on September 15

At Exit 121 (near Glenns Ferry). The entrance ramp is closed due to road construction work. Follow the detour signs. Width limit 14'0". Until October 30, 2020 at about 12:00PM MDT.

Web Comment: The west bound on ramp is closed due to the road construction, use alternate route

Last updated on September 21

Between Exit 165: ID 25 and Exit 173: US 93 (4 miles east of the Jerome area). Road construction work is in progress. There is work on the shoulder. People are working in the median. The road is being repaved. Observe the signs. The roadway is reduced to one lane. The left lane is closed. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 12'0". Until October 15, 2020 at about 5:30PM MDT.

Web Comment: All traffic will be switched to the eastbound lanes utilizing construction crossovers. Contractor: Western Construction 208-345-1440 Traffic Control: Aspen: 208-250-7150 ITD contact: Brock Dille 208-886-7800

Last updated on September 17

Between Exit 194: ID 25; Ridgeway Road and Exit 201: ID 25; Kasota Road (3 to 6 miles east of the Hazelton area). Road construction work is in progress. Road maintenance work is in progress. Look out for mobile maintenance operations. Bridge maintenance work is in progress. Bridge construction work is in progress. A seal coat treatment has been applied. The roadway is reduced to one lane. The right lane is closed. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 12'0". Until Wednesday, at about 6:00PM MDT.

Web Comment: Bridge repair Contractor: Coldwater Group 801-823-9493 Traffic Control: Roundabout Contractors 208-360-6381 ITD Contact: Randal Brunello 208-886-7851

Last updated yesterday at 3:15pm MDT

Between Exit 216: ID 25; ID 77 and Exit 228 (10 to 12 miles east of the Heyburn area). Road construction work is in progress. The road is being repaved. The roadway is reduced to two lanes. Follow the signs. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until November 30, 2020 at about 8:00PM MDT.

Web Comment: Westbound lanes will be closed. Traffic will be moved via crossovers into the eastbound lanes creating one eastbound and one westbound lane. DMS signs will be in operation. Traffic Control and Contractor: Wadsworth Brothers Const.

Last updated on September 3