Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 44
ID 44: Road construction, bridge construction, width limit in effect, roadway reduced to two lane. Width limit 12'0".

Between First Avenue East and South Dewey Avenue (Middleton). Road construction work is in progress. Bridge construction work is in progress. There is a width limit in effect. The roadway is reduced to two lanes. Width limit 12'0". Until May 8, 2019 at about 11:59PM MDT.

Web Comment: Crews are performing roadway work after replacing the Canyon Canal Bridge on SH-44, west of Dewey Ave in Middleton, ID. Traffic has been returned to its permanent configuration, but crews will be working on sidewalks and occasionally in the roadway to finalize the project.

Last updated on April 23
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on ID 44
Map of Reports on ID 44 Between Cove Colony Way and North Linder Road (near Eagle). Utility work is in progress. The roadway is reduced to one lane. Until Monday, at about 11:59PM MDT. Between State Street and North Parkinson Street (Eagle). Road construction work is in progress. There is work on the shoulder. Until July 14, 2019 at about 11:59PM MDT.
ID 44: Road construction, bridge construction, width limit in effect, roadway reduced to two lane. Width limit 12'0".
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations