Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions on US 30
US 30

Between 4800 North Road (9 miles west of the Buhl area) and Broadway Avenue (near Buhl). Road maintenance work is in progress. The roadway is reduced to one lane. The road is being repaved. A seal coat treatment has been applied. Expect delays. Look out for flaggers. A pilot car is in operation. Speed restrictions are in force. There is a width limit in effect. Expect 10 - minute delays. Speed limit 55 MPH. Width limit 14'0". From 7:00AM MDT to 7:00PM MDT on weekdays. Until August 10, 2018 at about 5:00PM MDT.

Web Comment: Pavement overlay followed by a seal coat between Banbury Grade and Buhl (milepost 191 to 200).

Last updated on July 9

Between Main Street - Hawthorne Road and Cedar Street (Pocatello). There is a height limit in effect. Height limit 13'5".

Web Comment: This is a permanent height restriction within the city limits of Pocatello, in both east and westbound lanes, at the railroad bridge on Garret Way, between Main Street and Cedar Street, at milepost 334.15.

Last updated on June 29

Between Cedar Street and Main Street - Hawthorne Road (Pocatello). There is a height limit in effect. Height limit 13'7".

Web Comment: There is a permanent height restriction within the city limits of Pocatello, affecting both eastbound and westbound travel.

Last updated on June 29

Between Potters Road and Bancroft Substation Road (2 to 6 miles east of the Lava Hot Springs area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. Look out for loose gravel on the roadway. Consider using an alternate route. Reduce your speed. Width limit 12'0". Until August 31, 2018 at about 11:59PM MDT.

Web Comment: 12 foot width restriction. Speed reduced to 45 miles per hour on Monday July 23. Wide Loads may call 208 234 3612 for updates contact Gene Staggs.

Last updated today at 9:19am MDT