Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions on I-15
I-15

Between Exit 36: US 91; Hawkins Road (3 miles south of the Arimo area) and Exit 40: Arimo Road (near Arimo). The road is being reconstructed. There is a width limit in effect. Speed limit 55 MPH. Until September 20, 2019 at about 11:59PM MDT.

Web Comment: Traffic shifted into one lane through the construction area for BOTH North and South Bound lanes. North Bound Width Restriction 16.0 ft. South Bound Width Restriction 13.0 ft. SB Exit 36 is closed. Use alternate Route.

Last updated yesterday at 7:59am MDT

Between Exit 167: ID 22 (Dubois) and The Montana State Line (11 miles north of the Spencer area). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. A seal coat treatment has been applied. Speed limit 60 MPH. Width limit 18'0". Until September 13, 2019 at about 11:59PM MDT.

Web Comment: Riverside Contracting, Inc applies micro-surfacing between Exit 167: ID 22 (Dubois) and The Montana State Line. The width limit is 18'. Please call Sean Baek for more information at 208-745-5686

Last updated on June 19

Between Exit 167: ID 22 (near Dubois) and Exit 180: Spenser Road (near Spencer). Major road construction work is in progress. The roadway is shared with opposing traffic. Speed limit 65 MPH. Width limit 18'0". Until July 31, 2019 at about 11:59PM MDT.

Last updated on July 15