Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 95
US 95: Bridge construction, roadway reduced to one lane, look out for flagger, temporary traffic light, width limit in effect, speed restrictions in force. Width limit 12'0". Speed limit 35 MPH.

Between East Fork Road and Old Highway (8 miles north of the Council area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Look out for temporary traffic lights. There is a width limit in effect. Speed restrictions are in force. Width limit 12'0". Speed limit 35 MPH. Until November 1, 2019 at about 7:00PM MDT.

Web Comment: The work zone will be reduced to a single lane with alternating one-way traffic. Traffic signals will be used at both ends of the structure. Flaggers will assist with traffic control as needed. Short term (up to 30 minute) full closures of US-95 may occur for girder placement. The Weiser River National Recreation Trail under the bridge will be closed and detoured across US-95 at the north end of the bridge (Fruitvale/Glendale Road). Motorists are encouraged to slow down and be prepared for stopped vehicles or crossing pedestrians at the signals.

Last updated on April 17
US 95: Bridge construction, roadway reduced to one lane, width limit in effect. Width limit 14'0".

Between Smokey Boulder Road and Hazard Creek Road (12 miles north of the New Meadows area). Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Width limit 14'0". Until November 18, 2019 at about 11:59PM MDT.

Web Comment: Crews are working to replace the Little Rainbow Bridge, on US-95 at approximately milepost 174. The new structure will be built adjacent to the old one, and the highway will realigned slightly to the southwest.

Last updated on April 16
US 95: Road reconstruction. Width limit 11'0".

Between Alderson Lane and Washington Street - Madison Street (Bonners Ferry). The road is being reconstructed. Width limit 11'0". Until October 1, 2019 at about 5:00PM PDT.

Web Comment: Activities will be phased to minimize public impact, however there will be intermittent blocking of the sidewalk, driveways and side streets. Crews will be working primarily on days, however some night shifts are anticipated. Some delays should be expected. Width restriction of 11 feet will be enforced beginning March 25, 2019 during the hours of 7:00 am to 6:00 pm Northwest Traffic Control - Sandi Walker 509-949-8710/Goodfellow Bros Project Superintendent Branden Pipkins 509-413-7544

Last updated on March 26
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 95
Map of Reports on US 95 Between Day Road and Appleton Lane (near Weiser). Look out for a surface water hazard. Reduce your speed. Between White Bird Creek Bridge (near White Bird) and Lake Road (6 miles north of the White Bird area). The roadway is reduced to two lanes. There is work on the shoulder. Until May 1, 2019 at about 5:00PM PDT. Between Old Reubens Road and Winchester-Culdesac Road (5 to 7 miles north of the Craigmont area). Road construction work is in progress. Drive with extreme caution. Expect delays. Speed limit 45 MPH. Until September 30, 2019 at about 6:00PM PDT. Between Alderson Lane and Washington Street - Madison Street (Bonners Ferry). The road is being reconstructed. Width limit 11'0". Until October 1, 2019 at about 5:00PM PDT.
US 95: Bridge construction, roadway reduced to one lane, look out for flagger, temporary traffic light, width limit in effect, speed restrictions in force. Width limit 12'0". Speed limit 35 MPH.
US 95: Bridge construction, roadway reduced to one lane, width limit in effect. Width limit 14'0".
US 95: Road reconstruction. Width limit 11'0".
US 95: Lewiston Hill
US 95: Bonners Ferry
US 95: Whitebird Hill
Bonners Ferry Weigh Station
Lewiston Weigh Station
Marsing Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations