Truck Restrictions on US 95
US 95

Between Twin House Road and Airport Road (1 mile south of the Cottonwood area). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 15 - minute delays. Until August 17, 2020 at about 6:00PM PDT.

Web Comment: The contractor's regular work hours are Monday through Friday from 6:00AM until 6:00PM Pacific Daylight Time. Travel lanes may be restricted to 12' width. For wide load accommodations contact the project's Traffic Control Supervisor Tabitha Warner at 208-512-0544. The culvert will be repaired and the roadway above the culvert will be improved. Travelers are advised to expect either shoulder closures without stopping, or flagging with one-lane passage and traffic signals on Twin House Road, causing short delays. Motorists are urged to exercise caution when traveling in the area as workers and equipment will be working both sides of the roadway.

Last updated on August 5

Between US Route 95 Business (6 miles north of the Craigmont area) and Winchester-Culdesac Road (7 miles south of the Culdesac area). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. Expect delays. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 35 MPH. Width limit 13'0". Until November 1, 2020 at about 6:00PM PDT.

Web Comment: The contractor's regular work schedule is Monday through Friday from 6:00 AM until 6:00PM PDT. Work is also scheduled for Saturday 8/15/20 from 6:00AM until 6:00PM PDT. Expect occasional traffic delays that could last up to 15 minutes during working hours. The overall pavement width is reduced to 26 feet total or 13 feet per direction of travel. For wide load accommodations contact the project's Project Manager (Dusty Forsmann @ 509-751-1580 or 509-780-1244) or the project's Superintendent (Matt Uptmor @509-254-7966). Motorists are urged to exercise caution when traveling in the area, as workers and equipment will be working close to traffic. Heavy rock excavation work has ceased for now, and will resume later in the season. Bridge construction has been completed to about 75%, and the temporary bridges are being removed. Some sections of the driving lanes (above the new bridge structures) are still gravel/fill material, and motorists are advised to slow down and follow the posted speed limits. Motorists are advised that the Old Winchester Grade is not a viable alternative to US-95 due to its extremely poor surface condition, load limit of 30,000 pounds, and low speed limit of 25 mph. The road is closed to through traffic and will be enforced by local law enforcement agencies. Due to the nature of this project, closure schedules are subject to change with little to no notice. Updates will be posted here as soon as they are known.

Last updated today at 6:30pm PDT

Between US 12 and Exit 312 (Lewiston). Road construction work is in progress. Bridge maintenance work is in progress. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 15 - minute delays. Until tomorrow at about 6:00PM PDT.

Web Comment: US-95 NB Ramp (Lewiston to Top of Hill) - Reduced to one lane 7/29/20 until 8/7/20. For wide load accommodations contact the project's Traffic Control Supervisor Tina Lee at 509-608-7492 or Jason Harris at 208-771-8569. Motorists are urged to exercise caution when traveling in the area as workers and equipment will be working both sides of the roadway.

More Info: US95US12 Junction Construction Detour Map

Last updated on August 7

Between Butler Creek Road and Heath Lake Road (7 to 10 miles south of the Sandpoint area). Night time construction work is in progress. The roadway is reduced to one lane because the road is being repaved. Width limit 14'0". Expect 15 - minute delays. Speed limit 55 MPH. Until Saturday, at about 7:00AM PDT.

Web Comment: Lane closures will occur at various locations in both directions on alternating lanes as crews work to repair failing pavement sections. Width restriction in place 7:00 pm to 7:00 am.

Last updated on July 27

Between Hall Mountain Road and County Road 34 (20 miles north of the Bonners Ferry area). Road construction work is in progress. The road is being repaved. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 15 - minute delays. Until October 2, 2020 at about 8:00PM PDT.

Web Comment: Full Bridge Replacement

Last updated on August 5