Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
Truck Restrictions on ID 3
ID 3

Between Sanderson Lane and Wood Creek Road (2 to 3 miles north of the Bovill area). Road construction work is in progress. The road is being repaved. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. There is a width limit in effect. Width limit 11'6". Expect 15 - minute delays. Until October 1, 2020 at about 5:00PM PDT.

Web Comment: Motorists should drive with extreme caution as there will be single lane yield traffic control during this project. Phase two will close the south bound lane for demolition and replacement of the north bound side of the existing bridge and is anticipated to begin Tuesday, September 1, 2020. Guardrail and asphalt approaches to the bridge will also be replaced.

Last updated on September 10

Between Poplar Road and Staples Creek Road (17 miles north of the Bovill area). Road construction work is in progress. The road is being repaved. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 15 - minute delays. Until October 16, 2020 at about 8:00PM PDT.

Web Comment: Full Bridge Replacement

Last updated on September 10