Truck Restrictions on I-84
I-84
Today at 5:15 PM, Google reported a 6 minute delay westbound.

Between US 20 and Exit 38: I-84B Nampa; Garrity Blvd (near Nampa). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Expect delays. The road is being repaved. There is work on the shoulder. Bridge construction work is in progress. Speed limit 55 MPH. Expect 10 - minute delays. Width limit 12'0". From 9:00PM MST to 5:00AM MST daily. Until tomorrow at about 6:00AM MST.

Web Comment: WIDTH LIMIT IS AT NIGHT ONLY. the width limit at night is 12'. (9 pm to 7 am) Expect night time lane closures through the duration of the project. Use caution when traveling through the work zone. Lane shifts occur throughout the project. Wide loads use caution as shoulder widths are limited throughout the project. Shoulder widths are reduced to two (2) feet in some areas. Expect nightly lane closures on Northside Blvd in January. Flaggers may be present to control traffic on Northside. I-84 WB lane closures are planned during the day time on Sunday, January 24th. Lane closures will begin at 9am. I-84 WB traffic will be reduced to a single lane between the Franklin interchange (Exit 36) and Karcher interchange (Exit 33). Crews will be working to reapply pavement markings.

Last updated today at 5:15pm MST