Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
Truck Restrictions on I-84
I-84

Between Exit 29: US 20; Franklin Road and Exit 38: I-84B; Garrity Blvd (near Nampa). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH. From 9:00PM MDT to 5:00AM MDT daily. Until January 28, 2021 at about 6:00AM MDT.

Web Comment: WIDTH LIMIT IS AT NIGHT ONLY. the width limit at night is 12'. Expect night time lane closures, through the duration of the project. Wide loads use caution as shoulder widths are limited throughout the project. Shoulder widths are reduced to two (2) feet in some areas. Expect nightly lane closures on Northside Blvd in August. Flaggers may be present to control traffic on Northside.

Last updated on August 7

Between Eastbound Blacks Creek Rest Area and The Boise Port of Entry (2 to 6 miles east of the Boise area). The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH. Width limit 14'0". Until August 18, 2020 at about 12:00PM MDT.

Web Comment: During various stages of construction there will be closures to I-84 lanes, ramps, and/or Blacks Creek Rd.

Last updated yesterday at 8:00pm MDT

At Exit 64: Black's Creek Road (4 miles east of the Boise area). The exit ramp is closed. Until August 18, 2020 at about 12:00PM MDT.

Web Comment: westbound exit ramp closed until August 18th. see map foe detour

Last updated on August 6

Between Exit 74: Simco Road and Exit 95: US 20; ID 51 (1 to 10 miles west of the Mountain Home area). Road construction work is in progress. A seal coat treatment has been applied. The roadway is reduced to one lane. Speed limit 65 MPH. Width limit 16'0". From 12:00AM MDT to 11:45PM MDT on Monday and Tuesday. Until tomorrow at about 11:45PM MDT.

Web Comment: Starting Monday, east bound traffic will be crossed over into the Westbound lanes. Eastbound exit 90 will be closed, use exit 95

Last updated on August 7

At Exit 90: I-84B (2 miles west of the Mountain Home area). Road construction work is in progress. The exit ramp is closed. From 12:00AM MDT to 11:45PM MDT on Monday and Tuesday. Until tomorrow at about 11:59PM MDT.

Web Comment: Eastbound Exit 90 off ramp is closed, use exit 95

Last updated on August 7

Between Exit 112: I-84B and Exit 125: 18th East Street (5 miles west of the Glenns Ferry area). Road construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Speed restrictions are in force. Speed limit 70 MPH. Width limit 14'0". Until October 30, 2020 at about 11:59PM MDT.

Web Comment: I-84 construction between Hammett and Glenns Ferry. All westbound traffic will be crossed over to eastbound I-84 in a two way traffic pattern.

Last updated on August 6

At Exit 121 (near Glenns Ferry). The entrance ramp is closed due to road construction work. Follow the detour signs. Width limit 14'0". Until October 30, 2020 at about 12:00PM MDT.

Web Comment: The west bound on ramp is closed due to the road construction, use alternate route

Last updated on July 28

Between Exit 165: ID 25 and Exit 173: US 93 (4 miles east of the Jerome area). Road construction work is in progress. There is work on the shoulder. People are working in the median. The road is being repaved. Observe the signs. The roadway is reduced to one lane. The left lane is closed. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until August 20, 2020 at about 5:30PM MDT.

Web Comment: Watch for construction workers and equipment working in the median constructing traffic cross overs and installing new storm water devices. Both east and westbound passing lanes closed. Contractor: Western Construction 208-345-1440 Traffic Control: Aspen: 208-250-7150 ITD contact: Brock Dille 208-886-7800

Last updated on July 16

Between Exit 194: ID 25; Ridgeway Road and Exit 201: ID 25; Kasota Road (3 to 6 miles east of the Hazelton area). Road construction work is in progress. Road maintenance work is in progress. Look out for mobile maintenance operations. Bridge maintenance work is in progress. Bridge construction work is in progress. A seal coat treatment has been applied. The roadway is reduced to one lane. The right lane is closed. Speed restrictions are in force. There is a width limit in effect. Speed limit 65 MPH. Width limit 14'0". Until September 30, 2020 at about 6:00PM MDT.

Web Comment: Bridge repair Contractor: Coldwater Group 801-823-9493 Traffic Control: Roundabout Contractors 208-360-6381 ITD Contact: Randal Brunello 208-886-7851

Last updated yesterday at 3:30pm MDT

Between Exit 216: ID 25; ID 77 and Exit 228 (10 to 12 miles east of the Heyburn area). Road construction work is in progress. The road is being repaved. The roadway is reduced to two lanes. Follow the signs. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until November 30, 2020 at about 8:00PM MDT.

Web Comment: Eastbound lanes will be closed. Traffic will be moved via crossovers into the westbound lanes creating one eastbound and one westbound lane. DMS signs will be in operation. Traffic Control and Contractor: Wadsworth Brothers Const.

Last updated on August 6

Between Westbound Juniper Rest Area and The Utah State Line (64 miles east of the Heyburn area). There is a width limit in effect. Road maintenance work is in progress. Width limit 11'0". Until September 30, 2020 at about 6:00PM MDT.

Web Comment: this is a Utah project. We were asked to post the 11 foot width restriction on our 511. this happens right at the border. please call 1-800-292-3557 for information on wide loads

Last updated on August 7