Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions on I-84B
I-84B

Between 8th North Street and Jackson Street (Mountain Home). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Look out for flaggers. There is a width limit in effect. Width limit 14'0". Until December 30, 2019 at about 11:59PM MST.

Web Comment: Storm drain installation, Sidewalk and curb replacement, asphalt patch

Last updated on December 3

Between I-84 (1 mile west of the Bliss area) and A Avenue (near Bliss). The road is closed. Road construction work is in progress. Bridge construction work is in progress. The road is being repaved. Until March 13, 2020 at about 7:00PM MST.

Web Comment: Replacing bridge over railroad, replace existing box culvert, and repaving roadway Contractor: Western Construction 208-345-1440 Exit 137 is open but eastbound traffic is prohibited, Exit 141 Accessible to Bliss

Last updated on December 2