Truck Restrictions on I-84
I-84

Between Exit 216: ID 25; ID 77 and Exit 228 (10 to 12 miles east of the Heyburn area). Road construction work is in progress. The road is being repaved. The roadway is reduced to two lanes. Follow the signs. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until November 30, 2020 at about 8:00PM MDT.

Web Comment: Eastbound lanes will be closed. Traffic will be moved via crossovers into the westbound lanes creating one eastbound and one westbound lane. DMS signs will be in operation. Traffic Control and Contractor: Wadsworth Brothers Const.

Last updated on March 13

Between Exit 254: Sweetzer Road and Sweetzer Summit (44 miles east of the Heyburn area). Road maintenance work is in progress. The roadway is reduced to one lane. The left lane is closed. There is a width limit in effect. Until today at about 11:59PM MDT.

Web Comment: Left lane closed to repair damaged cable guardrail. nothing wider than 22 feet while this is repaired. Contractor: Railco 208-886-7688