Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions on US 95
US 95

Between East Fork Road and Old Highway (8 miles north of the Council area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for temporary traffic lights. Speed restrictions are in force. Expect delays. There is a width limit in effect. Width limit 14'0". Speed limit 35 MPH. Expect 15 - minute delays. Until June 1, 2020 at about 7:00PM MST.

Web Comment: US-95 will operate with traffic signal controlled alternating one-way traffic over the bridge.

Last updated on November 14

Between West Garwood Road; East Garwood Road and Ohio Match Road (2 to 3 miles north of the Hayden area). There is work on the shoulder. The right lane is closed. Speed limit 55 MPH. Width limit 17'0". From 7:00AM PST to 5:00PM PST on weekdays. Until Friday, at about 5:00PM PST.

Last updated on November 13

Between Alderson Lane and Washington Street - Madison Street (Bonners Ferry). The road is being reconstructed. Width limit 11'0". Until Friday, at about 5:00PM PST.

Web Comment: US-95: Traffic will be in the temporary Phase 2C alignment on the East and West side of US-95. 11' Lane Width. No wide loads except Tuesday and Thursday Mornings 3AM to 6AM. Contact Tana Flowerdew 208-512-9726 for traffic Control. Wide Loads may pass through Saturday and Sunday from 12:30 AM to 6:00 AM will also call Tana Flowerdew 298-512-9726 for traffic Control. Side Streets on the East and West side of US-95 will be intermittently closed. Northwest Traffic Control - Tana Flowerdew 208-512-9726/Goodfellow Bros Project Engineer Branden Pipkins 509-413-7544,,/GBI Mike Jacobs 509-679-0035.

Last updated on November 12