Truck Restrictions on ID 55
ID 55

Between US 95 (1 mile south of the Marsing area) and Sunnyslope Road (near Marsing). Road construction work is in progress. The roadway is reduced to one lane. Observe the signals. Look out for flaggers. Expect delays. There is a width limit in effect. The intersecting road is closed. Width limit 11'0". Expect 10 - minute delays. Until June 15, 2020 at about 7:00PM MDT.

Web Comment: Paving operations will require road closures at all intersecting roads on the south side of Highway 55. These closures will prevent traffic from accessing Highway 55 from the south side of highway. All northern access at these intersections will be open to traffic. Paving operations will begin June 19th and expected to continue for 2 to 3 days. Highway 78 paving preparation and paving work is anticipated to be conduction June 14th and June 17th to the end of the paving operation as mentioned above. Throughout the Highway 78 paving operations, an anticipated detour for all Highway 55 to Highway 78 truck traffic, and vice versa, will be directed to Bruneau Highway and E. Pershall Road.

More Info: Press Release

Last updated on June 14

Between Sportsman Access and Smith's Ferry Drive - High Valley Road (14 to 20 miles south of the Cascade area). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Expect delays. Look out for flaggers. A pilot car is in operation. Speed restrictions are in force. There is a width limit in effect. Expect 15 - minute delays. Speed limit 35 MPH. Width limit 11'0". From 3:00AM MDT to 6:00PM MDT on Monday, Tuesday, Wednesday and Thursday. Until June 28, 2019 at about 11:59PM MDT.

Web Comment: Crews are not allowed to work during the weekends to minimize impacts on traffic. When work is being performed, traffic will be limited to one-lane operations with flaggers and a pilot car. Expect delays of up to 15 minutes.