Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
I-90
I-90 westbound: Long term road construction, bridge construction, lane closed, width limit in effect, traffic congestion. Speed limit 55 MPH.

Between Exit 15: Sherman Avenue and Exit 13: 4th Street (Coeur d'Alene). Look out for long term road construction work. Bridge construction work is in progress. A lane is closed. There is a width limit in effect. Look out for traffic congestion. Speed limit 55 MPH. Until September 29, 2020 at about 5:30PM PDT.

Web Comment: Work to replace the Pennsylvania Ave bridges begins in March. For more details visit itdprojects.org/i90pennsylvania. Width restriction is 19'.

Last updated on July 6
I-90 eastbound: Long term road construction, bridge construction, lane closed, traffic congestion. Speed limit 55 MPH. Width limit 13'0".

Between Exit 14: 15th Street and Exit 15: Sherman Avenue (Coeur d'Alene). Look out for long term road construction work. Bridge construction work is in progress. A lane is closed. Look out for traffic congestion. Speed limit 55 MPH. Width limit 13'0". Until September 29, 2020 at about 5:30PM PDT.

Web Comment: Work to replace the Pennsylvania Ave bridges begins in March. For more details visit itdprojects.org/i90pennsylvania

Last updated on July 6
I-90 in both directions: Bridge construction, road construction, roadway reduced to one lane. Speed limit 55 MPH. Width limit 14'0".

Between Exit 17: Mullan Road and Exit 22: ID 97 (2 to 5 miles east of the Coeur d'Alene area). Bridge construction work is in progress. Road construction work is in progress. The roadway is reduced to one lane. Speed limit 55 MPH. Width limit 14'0". Until August 31, 2020 at about 7:00PM PDT.

Web Comment: median cross-over will be in use. Current traffic pattern will remain through the 4th of July Weekend. After the 4th of July Weekend work will shift to the Westbound Bridge. Eastbound traffic will be crossed over to the eastbound structure.

Last updated yesterday at 4:45pm PDT
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-90
Map of Reports on I-90 Between Exit 15: Sherman Avenue and Exit 13: 4th Street (Coeur d'Alene). Look out for long term road construction work. Bridge construction work is in progress. A lane is closed. There is a width limit in effect. Look out for traffic congestion. Speed limit 55 MPH. Until September 29, 2020 at about 5:30PM PDT. Between Exit 14: 15th Street and Exit 15: Sherman Avenue (Coeur d'Alene). Look out for long term road construction work. Bridge construction work is in progress. A lane is closed. Look out for traffic congestion. Speed limit 55 MPH. Width limit 13'0". Until September 29, 2020 at about 5:30PM PDT. Between Exit 17: Mullan Road and Exit 22: ID 97 (2 to 5 miles east of the Coeur d'Alene area). Bridge construction work is in progress. Road construction work is in progress. The roadway is reduced to one lane. Speed limit 55 MPH. Width limit 14'0". Until August 31, 2020 at about 7:00PM PDT.
I-90 westbound: Long term road construction, bridge construction, lane closed, width limit in effect, traffic congestion. Speed limit 55 MPH.
I-90 eastbound: Long term road construction, bridge construction, lane closed, traffic congestion. Speed limit 55 MPH. Width limit 13'0".
I-90 in both directions: Bridge construction, road construction, roadway reduced to one lane. Speed limit 55 MPH. Width limit 14'0".
I-90: Lookout Pass
Huetter Weigh Station
Haugan Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations