I-84
I-84: Road construction, roadway reduced to one lane, speed restrictions in force, width limit in effect. Speed limit 55 MPH.

Between Exit 29: US 20; Franklin Road and Exit 38: I-84B; Garrity Blvd (near Nampa). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH. From 7:00PM MDT to 7:00AM MDT daily. Until January 28, 2021 at about 6:00AM MDT.

Web Comment: WIDTH LIMIT IS AT NIGHT ONLY. the width limit at night is 12'. Expect night time lane closures, through the duration of the project. I-84 nightly lane closures will begin earlier through the month of May. EB lane closures will begin at 7PM and WB lane closures will begin at 8PM. Lane closures will be removed by 6AM for EB traffic and 7AM for WB. Wide loads use caution as shoulder widths are limited throughout the project. Expect nightly lane closures on Northside Blvd through April. Flaggers may be present to control traffic.

Last updated today at 6:30pm MDT
I-84: Road construction, speed restrictions in force, right lane closed, entrance ramp closed. Speed limit 55 MPH.

Between Exit 64: Black's Creek Road and The Boise Port of Entry (4 miles east of the Boise area). Road construction work is in progress. Speed restrictions are in force. The right lane is closed. The entrance ramp is closed. Speed limit 55 MPH. Until Saturday, at about 7:00PM MDT.

Last updated on May 30
I-84: Road construction, roadway reduced to one lane, width limit in effect, speed restrictions in force. Speed limit 70 MPH. Width limit 14'0".

Between Exit 112: I-84B and Exit 125: 18th East Street (5 miles west of the Glenns Ferry area). Road construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Speed restrictions are in force. Speed limit 70 MPH. Width limit 14'0". Until October 30, 2020 at about 11:59PM MDT.

Web Comment: I-84 construction between Hammett and Glenns Ferry. All westbound traffic will be crossed over to eastbound I-84 in a two way traffic pattern.

Last updated on May 27
I-84 in both directions: Road construction, work on the shoulder, work in the median, paving operation, observe sign, roadway reduced to one lane, left lane closed, consider using an alternate route, speed restrictions in force, width limit in effect. Speed limit 70 MPH. Width limit 12'0".

Between Exit 165: ID 25 and Exit 173: US 93 (4 miles east of the Jerome area). Road construction work is in progress. There is work on the shoulder. People are working in the median. The road is being repaved. Observe the signs. The roadway is reduced to one lane. The left lane is closed. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until July 15, 2020 at about 5:30PM MDT.

Web Comment: Watch for construction workers and equipment working in the median constructing traffic cross overs and installing new storm water devices. Both east and westbound passing lanes closed. Contractor: Western Construction 208-345-1440 Traffic Control: Aspen: 208-250-7150 ITD contact: Brock Dille 208-886-7800

Last updated on May 7
I-84 in both directions: Road construction, paving operation, roadway reduced to two lane, follow the sign, speed restrictions in force, width limit in effect. Speed limit 70 MPH. Width limit 12'0".

Between Exit 216: ID 25; ID 77 and Exit 228 (10 to 12 miles east of the Heyburn area). Road construction work is in progress. The road is being repaved. The roadway is reduced to two lanes. Follow the signs. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until November 30, 2020 at about 8:00PM MDT.

Web Comment: Eastbound lanes will be closed. Traffic will be moved via crossovers into the westbound lanes creating one eastbound and one westbound lane. DMS signs will be in operation. Traffic Control and Contractor: Wadsworth Brothers Const.

Last updated on May 12
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-84
Map of Reports on I-84 Between Exit 28: 10th Street (Caldwell) and Exit 35: Northside Boulevard (Nampa). Look out for rush hour traffic. Between Exit 29: US 20; Franklin Road and Exit 38: I-84B; Garrity Blvd (near Nampa). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Speed limit 55 MPH. From 7:00PM MDT to 7:00AM MDT daily. Until January 28, 2021 at about 6:00AM MDT. Between Exit 36 (Nampa) and Exit 44: ID 69 (near Meridian). Look out for rush hour traffic. Between Eastbound Blacks Creek Rest Area and The Boise Port of Entry (2 to 6 miles east of the Boise area). Bridge construction work is in progress. A lane is closed intermittently. Speed restrictions are in force. Speed limit 70 MPH. Until September 20, 2020 at about 11:59PM MDT. Between Exit 112: I-84B and Exit 125: 18th East Street (5 miles west of the Glenns Ferry area). Road construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Speed restrictions are in force. Speed limit 70 MPH. Width limit 14'0". Until October 30, 2020 at about 11:59PM MDT. Between Exit 165: ID 25 and Exit 173: US 93 (4 miles east of the Jerome area). Road construction work is in progress. There is work on the shoulder. People are working in the median. The road is being repaved. Observe the signs. The roadway is reduced to one lane. The left lane is closed. Consider using an alternate route. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until July 15, 2020 at about 5:30PM MDT. Between Exit 216: ID 25; ID 77 and Exit 228 (10 to 12 miles east of the Heyburn area). Road construction work is in progress. The road is being repaved. The roadway is reduced to two lanes. Follow the signs. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until November 30, 2020 at about 8:00PM MDT. Between Exit 245: 1400S Road and Exit 254: Sweetzer Road (38 to 39 miles east of the Heyburn area). People are working in the median. The roadway is reduced to one lane. The left lane is closed. Speed restrictions are in force. Speed limit 45 MPH. Until tomorrow at about 6:00PM MDT.
I-84: Road construction, roadway reduced to one lane, speed restrictions in force, width limit in effect. Speed limit 55 MPH.
I-84: Road construction, speed restrictions in force, right lane closed, entrance ramp closed. Speed limit 55 MPH.
I-84: Road construction, roadway reduced to one lane, width limit in effect, speed restrictions in force. Speed limit 70 MPH. Width limit 14'0".
I-84 in both directions: Road construction, work on the shoulder, work in the median, paving operation, observe sign, roadway reduced to one lane, left lane closed, consider using an alternate route, speed restrictions in force, width limit in effect. Speed limit 70 MPH. Width limit 12'0".
I-84 in both directions: Road construction, paving operation, roadway reduced to two lane, follow the sign, speed restrictions in force, width limit in effect. Speed limit 70 MPH. Width limit 12'0".
East Boise Weigh Station