Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
US 20
US 20: Road construction, work on the shoulder, width limit in effect. Width limit 12'0".

Between ID 16 and North Linder Road (1 to 3 miles west of the Eagle area). Road construction work is in progress. There is work on the shoulder. There is a width limit in effect. Width limit 12'0". Until November 30, 2020 at about 11:59PM MDT.

Web Comment: Expect night work between 1/31/20 and 2/9/20 with traffic periodically reduced to one lane with flagger control. Please drive with caution. 12 width restriction between Black Cat and Linder Road

Last updated yesterday at 7:45am MDT
US 20: Spring breakup restriction, axle load limit in effect. Speed limit 55 MPH. Advisory speed limit 30 MPH.

Between 800 North Road (6 miles east of the St. Anthony area) and 3500 East Road (near Ashton). Spring breakup restrictions in place. There is an axle load limit in effect. Speed limit 55 MPH. Advisory speed limit 30 MPH.

Web Comment: Commercial Vehicles 10,000 GVWR and greater restricted to 30 mph with legal axle weight. Restrictions are in place because the highway is showing stress from winter freeze/thaw cycles.

Last updated on March 6
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 20
Map of Reports on US 20 Between Eleventh Avenue North Extension (5 miles east of the Caldwell area) and North Fox Run Avenue (near Eagle). Look out for rush hour traffic. Between ID 16 and North Linder Road (1 to 3 miles west of the Eagle area). Road construction work is in progress. There is work on the shoulder. There is a width limit in effect. Width limit 12'0". Until November 30, 2020 at about 11:59PM MDT. Between Spurwing Way (1 mile west of the Eagle area) and Jerico Road (Eagle). Road construction work is in progress. There is work on the shoulder. Look out for flaggers. Until October 30, 2020 at about 11:59PM MDT. Between Jerico Road (near Eagle) and ID 55 (Boise). Road construction work is in progress. There is work on the shoulder. Until November 18, 2020 at about 8:00PM MDT. Between Cloverdale Road - Joplin Road and I-184 (Boise). Look out for rush hour traffic. Between Blaine Road and County Line Road; Camp Creek Road (11 miles east of the Fairfield area). Road construction work is in progress. Warning. Until June 15, 2020 at about 7:00PM MDT. Between 2400 North Road (near Butte City) and Brunt Road (24 miles west of the Idaho Falls area). Look out for large animals on the roadway. Be aware of the animal crossing area. Drive with extreme caution. Until April 6, 2020 at about 7:00AM MDT. Between 800 North Road (6 miles east of the St. Anthony area) and 3500 East Road (near Ashton). Look out for potholes. Drive with extreme caution. A mandatory speed limit is in force.
US 20: Road construction, work on the shoulder, width limit in effect. Width limit 12'0".
US 20: Spring breakup restriction, axle load limit in effect. Speed limit 55 MPH. Advisory speed limit 30 MPH.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations