Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
I-90
I-90 westbound: Long term road construction, bridge construction, lane closed, width limit in effect. Speed limit 55 MPH.

Between Exit 15: Sherman Avenue and Exit 13: 4th Street (Coeur d'Alene). Look out for long term road construction work. Bridge construction work is in progress. A lane is closed. There is a width limit in effect. Speed limit 55 MPH. Until September 29, 2020 at about 5:30PM PDT.

Web Comment: Work to replace the Pennsylvania Ave bridges begins in March. For more details visit itdprojects.org/i90pennsylvania. Width restriction is 19'.

Last updated on May 25
I-90 eastbound: Long term road construction, bridge construction, lane closed. Speed limit 55 MPH. Width limit 13'0".

Between Exit 14: 15th Street and Exit 15: Sherman Avenue (Coeur d'Alene). Look out for long term road construction work. Bridge construction work is in progress. A lane is closed. Speed limit 55 MPH. Width limit 13'0". Until September 29, 2020 at about 5:30PM PDT.

Web Comment: Work to replace the Pennsylvania Ave bridges begins in March. For more details visit itdprojects.org/i90pennsylvania

Last updated on May 25
I-90 in both directions: Bridge construction, road construction, roadway reduced to one lane. Speed limit 45 MPH. Width limit 14'0".

Between Exit 17: Mullan Road and Exit 22: ID 97 (2 to 5 miles east of the Coeur d'Alene area). Bridge construction work is in progress. Road construction work is in progress. The roadway is reduced to one lane. Speed limit 45 MPH. Width limit 14'0". Until August 31, 2020 at about 7:00PM PDT.

Web Comment: median cross-over will be in use

Last updated on May 25
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-90
Map of Reports on I-90 Between The Washington State Line (near Post Falls) and Exit 12: US 95 (Coeur d'Alene). There is work on the shoulder. Look out for roadside mowing. Drive with extreme caution. Until June 19, 2020 at about 3:00PM PDT. Between Exit 15: Sherman Avenue and Exit 13: 4th Street (Coeur d'Alene). Look out for long term road construction work. Bridge construction work is in progress. A lane is closed. There is a width limit in effect. Speed limit 55 MPH. Until September 29, 2020 at about 5:30PM PDT. Between Exit 14: 15th Street and Exit 15: Sherman Avenue (Coeur d'Alene). Look out for long term road construction work. Bridge construction work is in progress. A lane is closed. Speed limit 55 MPH. Width limit 13'0". Until September 29, 2020 at about 5:30PM PDT. Between Exit 17: Mullan Road and Exit 22: ID 97 (2 to 5 miles east of the Coeur d'Alene area). Bridge construction work is in progress. Road construction work is in progress. The roadway is reduced to one lane. Speed limit 45 MPH. Width limit 14'0". Until August 31, 2020 at about 7:00PM PDT. Between Fourth of July Pass and Exit 39: Old Mission State Park (8 to 11 miles west of the Pinehurst area). Road maintenance work is in progress. The right lane is closed. There is work on the shoulder. Until today at about 2:30PM PDT.
I-90 westbound: Long term road construction, bridge construction, lane closed, width limit in effect. Speed limit 55 MPH.
I-90 eastbound: Long term road construction, bridge construction, lane closed. Speed limit 55 MPH. Width limit 13'0".
I-90 in both directions: Bridge construction, road construction, roadway reduced to one lane. Speed limit 45 MPH. Width limit 14'0".
I-90: Lookout Pass
Huetter Weigh Station
Haugan Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations