Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions on US 12
US 12

Between Main Street and ID 128 (near Lewiston). Road construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. A detour is in operation. There is a width limit in effect. Width limit 10'0". Until August 17, 2018 at about 10:00PM PDT.

Web Comment: US-12 from Memorial Bridge to Rose Garden - The roadway is expected to be reduced to one lane in each direction from 6:00PM to 6:00AM. Spall repairs, concrete grinding, and crack and joint sealing. Motorists are urged to exercise caution when traveling in the area as workers and equipment will be working very close to the lanes open for traffic.

Last updated yesterday at 1:12pm PDT

Between State Highway 13 Business and Harris Ridge Road (1 mile east of the Kooskia area). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. There is a height limit in effect. Width limit 12'0". Height limit 17'0". Until October 22, 2018 at about 6:00PM PDT.

Web Comment: The existing bridge will be removed and replaced at Milepost 76.8 with a new structure. Project will be completed in two phases and one lane of traffic will be maintained. Temporary Traffic Signals will be used 24 hours per day for the duration of the project to control traffic flow in each direction. Travelling public should expect delays.

Last updated on July 12

Between Pete King Creek Road and The Colgate Licks Rest Area (38 to 64 miles east of the Kooskia area). The road is being repaved. A seal coat treatment has been applied. The roadway is reduced to one lane. Expect delays. Consider using an alternate route. A pilot car is in operation. Look out for flaggers. Speed restrictions are in force. Width limit 12'0". Speed limit 25 MPH. Until October 31, 2018 at about 6:00AM PDT.

Web Comment: Milling and Paving, 30min Delays

Last updated on July 12

Between Pete King Creek Road and Bald Mountain (44 miles east of the Kooskia area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 25 MPH. Width limit 11'0". Until October 15, 2018 at about 6:00PM PDT.

Web Comment: The existing bridge will be removed and replaced at Milepost 120 with a new structure. Project will be completed in two phases and one lane of traffic will be maintained. Temporary Traffic Signals will be used 24 hours per day for the duration of the project to control traffic flow in each direction. Travelling public should expect delays. Workers present from 7:00AM PDT to 6:00PM PDT on Monday, Tuesday, Wednesday and Thursday until October 15.

Last updated on July 12