Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
US 26
US 26: Bridge construction, temporary traffic light, detour in operation, speed restrictions in force, width limit in effect, see map for detour(s). Speed limit 5 MPH. Width limit 16'0".

Between Jacobsen Lane and Moreland Road (3 miles west of the Blackfoot area). Bridge construction work is in progress. Look out for temporary traffic lights. A detour is in operation. Speed restrictions are in force. There is a width limit in effect. Speed limit 5 MPH. Width limit 16'0".

Last updated on May 26
US 26 westbound: Height limit in effect. Height limit 13'8".

Between South Boulevard and F Street (Idaho Falls). There is a height limit in effect. Height limit 13'8".

Web Comment: There is a permanent height restriction of 13 feet 8 inches on the westbound underpass south of G Street in Idaho Falls. The underpass runs beneath the transportation department's South Boulevard Bridge and the Union Pacific's Railroad Bridge, which bridges lie side by side over U.S. 26 (Yellowstone Highway) at milepost 333.51 in Idaho Falls.

Last updated on May 11
US 26 eastbound: Height limit in effect. Height limit 13'8".

Between F Street and South Boulevard (Idaho Falls). There is a height limit in effect. Height limit 13'8".

Web Comment: There is a permanent height restriction of 13 feet 8 inches on the eastbound underpass south of G Street in Idaho Falls. The underpass runs beneath the transportation department's South Boulevard Bridge and then beneath the Union Pacific Railroad bridge, which bridges lie side by side over U.S. 26 (Yellowstone Highway) at milepost 333.51 in Idaho Falls.

Last updated on May 11
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 26
Map of Reports on US 26 Between US 20 (5 miles west of the Atomic City area) and Section Road (7 miles east of the Atomic City area). Look out for construction work. The roadway is reduced to one lane. The shoulder is closed. Look out for flaggers. A pilot car is in operation. Speed restrictions are in force. Speed limit 50 MPH. Until October 30, 2020 at about 7:00PM MDT. Between Jacobsen Lane and Moreland Road (3 miles west of the Blackfoot area). Bridge construction work is in progress. Look out for temporary traffic lights. A detour is in operation. Speed restrictions are in force. There is a width limit in effect. Speed limit 5 MPH. Width limit 16'0".
US 26: Bridge construction, temporary traffic light, detour in operation, speed restrictions in force, width limit in effect, see map for detour(s). Speed limit 5 MPH. Width limit 16'0".
US 26 westbound: Height limit in effect. Height limit 13'8".
US 26 eastbound: Height limit in effect. Height limit 13'8".
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations