Between 500 South Road and 300 South Road (3 to 4 miles north of the Twin Falls area). Look out for construction work. The left lane is closed. There is a width limit in effect. Width limit 16'0". Until October 5, 2018 at about 5:00PM MDT.

Web Comment: Repairs to recently completed roadwork along US 93 between 500 and 300 South Roads (milepost 54 to 55).

Last updated today at 10:29am MDT

Between Lime Creek Road and Challis Hot Springs Road (4 miles south of the Challis area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for temporary traffic lights. There is a width limit in effect. Width limit 11'0". Advisory speed limit 35 MPH. Until September 30, 2018 at about 5:30PM MDT.

Web Comment: Wadsworth Brothers Construction is constructing a bridge across Warm Springs. For loads wider than 11'0" contact Bryan Young at 208-745-5682. Please restrict the use of Jake brakes in these areas.

Last updated on September 13