ID 3 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, width limit in effect. Width limit 11'6". Expect 15 - minute delays.

Between Sanderson Lane and Wood Creek Road (2 to 3 miles north of the Bovill area). Road construction work is in progress. The road is being repaved. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. There is a width limit in effect. Width limit 11'6". Expect 15 - minute delays. Until October 1, 2020 at about 5:00PM PDT.

Web Comment: Motorists should drive with extreme caution as there will be single lane yield traffic control during this project. Phase two will close the south bound lane for demolition and replacement of the north bound side of the existing bridge and is anticipated to begin Tuesday, September 1, 2020. Guardrail and asphalt approaches to the bridge will also be replaced.

Last updated on September 10
ID 3 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, look out for flagger, width limit in effect. Width limit 12'0". Expect 15 - minute delays.

Between Poplar Road and Staples Creek Road (17 miles north of the Bovill area). Road construction work is in progress. The road is being repaved. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 15 - minute delays. Until October 16, 2020 at about 8:00PM PDT.

Web Comment: Full Bridge Replacement

Last updated on September 10
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on ID 3
Map of Reports on ID 3 Between Sanderson Lane and Wood Creek Road (2 to 3 miles north of the Bovill area). Road construction work is in progress. The road is being repaved. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. There is a width limit in effect. Width limit 11'6". Expect 15 - minute delays. Until October 1, 2020 at about 5:00PM PDT. Between Saint Joe River Road (1 mile south of the Parkline area) and Goose Heaven Road (1 mile north of the Parkline area). A lane is closed intermittently. Look out for flaggers. Until Friday, at about 5:00PM PDT.
ID 3 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, width limit in effect. Width limit 11'6". Expect 15 - minute delays.
ID 3 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, look out for flagger, width limit in effect. Width limit 12'0". Expect 15 - minute delays.