Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 95
US 95: Bridge construction, roadway reduced to one lane, temporary traffic light, speed restrictions in force, delay, width limit in effect. Width limit 14'0". Speed limit 35 MPH. Expect 15 - minute delays.

Between East Fork Road and Old Highway (8 miles north of the Council area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for temporary traffic lights. Speed restrictions are in force. Expect delays. There is a width limit in effect. Width limit 14'0". Speed limit 35 MPH. Expect 15 - minute delays. Until June 1, 2020 at about 7:00PM MST.

Web Comment: US-95 will operate with traffic signal controlled alternating one-way traffic over the bridge.

Last updated on November 14
US 95 northbound: Work on the shoulder, right lane closed. Speed limit 55 MPH. Width limit 17'0".

Between West Garwood Road; East Garwood Road and Ohio Match Road (2 to 3 miles north of the Hayden area). There is work on the shoulder. The right lane is closed. Speed limit 55 MPH. Width limit 17'0". From 7:00AM PST to 5:00PM PST on weekdays. Until Friday, at about 5:00PM PST.

Last updated on November 13
US 95: Road reconstruction. Width limit 11'0".

Between Alderson Lane and Washington Street - Madison Street (Bonners Ferry). The road is being reconstructed. Width limit 11'0". Until Saturday, at about 5:00PM PST.

Web Comment: US-95: Traffic will be in the temporary Phase 2C alignment on the East and West side of US-95. 11' Lane Width. No wide loads except Tuesday and Thursday Mornings 3AM to 6AM. Contact Tana Flowerdew 208-512-9726 for traffic Control. Wide Loads may pass through Saturday and Sunday from 12:30 AM to 6:00 AM will also call Tana Flowerdew 298-512-9726 for traffic Control. Side Streets on the East and West side of US-95 will be intermittently closed. Northwest Traffic Control - Tana Flowerdew 208-512-9726/Goodfellow Bros Project Engineer Branden Pipkins 509-413-7544,,/GBI Mike Jacobs 509-679-0035.

Last updated yesterday at 8:04am PST
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 95
Map of Reports on US 95 Between Fruitvale Glendale Road (7 miles north of the Council area) and Price Valley Road (4 miles south of the New Meadows area). Road maintenance work is in progress. Between US Route 95 Business and Winchester-Culdesac Road (6 to 7 miles north of the Craigmont area). The road is being repaved. Expect delays. Look out for flaggers. Speed restrictions are in force. Speed limit 35 MPH. Expect 15 - minute delays. Until Friday, at about 11:59PM PST. Between I-90 (Coeur d'Alene) and Lancaster Road (Hayden). Look out for rush hour traffic. Between West Garwood Road; East Garwood Road and Ohio Match Road (2 to 3 miles north of the Hayden area). There is work on the shoulder. The right lane is closed. Speed limit 55 MPH. Width limit 17'0". From 7:00AM PST to 5:00PM PST on weekdays. Until Friday, at about 5:00PM PST. Between Alderson Lane and Washington Street - Madison Street (Bonners Ferry). The road is being reconstructed. Width limit 11'0". Until Saturday, at about 5:00PM PST.
US 95: Bridge construction, roadway reduced to one lane, temporary traffic light, speed restrictions in force, delay, width limit in effect. Width limit 14'0". Speed limit 35 MPH. Expect 15 - minute delays.
US 95 northbound: Work on the shoulder, right lane closed. Speed limit 55 MPH. Width limit 17'0".
US 95: Road reconstruction. Width limit 11'0".
US 95: Lewiston Hill
US 95: Bonners Ferry
US 95: Whitebird Hill
Bonners Ferry Weigh Station
Lewiston Weigh Station
Marsing Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations