Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
US 26
US 26: Construction work, paving operation, roadway reduced to one lane, rough road, look out for flagger, pilot car in operation, no passing. Speed limit 50 MPH. Width limit 14'6". Expect 15 - minute delays.

Between US 20 (5 miles west of the Atomic City area) and Section Road (7 miles east of the Atomic City area). Look out for construction work. The road is being repaved. The roadway is reduced to one lane. The road is rough. Look out for flaggers. A pilot car is in operation. No passing. Speed limit 50 MPH. Width limit 14'6". Expect 15 - minute delays. Until October 30, 2020 at about 7:00PM MDT.

Last updated on September 15
US 26 westbound: Height limit in effect. Height limit 13'8".

Between South Boulevard and F Street (Idaho Falls). There is a height limit in effect. Height limit 13'8".

Web Comment: There is a permanent height restriction of 13 feet 8 inches on the westbound underpass south of G Street in Idaho Falls. The underpass runs beneath the transportation department's South Boulevard Bridge and the Union Pacific's Railroad Bridge, which bridges lie side by side over U.S. 26 (Yellowstone Highway) at milepost 333.51 in Idaho Falls.

Last updated on August 28
US 26 eastbound: Height limit in effect. Height limit 13'8".

Between F Street and South Boulevard (Idaho Falls). There is a height limit in effect. Height limit 13'8".

Web Comment: There is a permanent height restriction of 13 feet 8 inches on the eastbound underpass south of G Street in Idaho Falls. The underpass runs beneath the transportation department's South Boulevard Bridge and then beneath the Union Pacific Railroad bridge, which bridges lie side by side over U.S. 26 (Yellowstone Highway) at milepost 333.51 in Idaho Falls.

Last updated on August 28
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 26
Map of Reports on US 26 Between US 20 (5 miles west of the Atomic City area) and Section Road (7 miles east of the Atomic City area). Look out for construction work. The road is being repaved. The roadway is reduced to one lane. The road is rough. Look out for flaggers. A pilot car is in operation. No passing. Speed limit 50 MPH. Width limit 14'6". Expect 15 - minute delays. Until October 30, 2020 at about 7:00PM MDT.
US 26: Construction work, paving operation, roadway reduced to one lane, rough road, look out for flagger, pilot car in operation, no passing. Speed limit 50 MPH. Width limit 14'6". Expect 15 - minute delays.
US 26 westbound: Height limit in effect. Height limit 13'8".
US 26 eastbound: Height limit in effect. Height limit 13'8".
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations