Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions on I-90
I-90

Between Westbound Huetter Rest Area and Exit 17: Mullan Road (near Coeur d'Alene). Be aware of narrow lanes. There is a width limit in effect. Width limit 11'0". Until July 10, 2018 at about 5:00AM PDT.

Web Comment: Both directions on I90 will be narrowed down to two 11' lanes with a 2' shoulder starting on April 7th. Wide loads should be advised.

Last updated on June 11

Between Exit 17: Mullan Road and Exit 22: ID 97 (2 to 5 miles east of the Coeur d'Alene area). Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Truck restrictions are in force. Speed restrictions are in force. Until October 16, 2018 at about 11:45PM PDT.

Web Comment: All traffic is crossed over to the EB Structure, with only one lane, each direction. Pay attention to signs. There is a 14 ft width restriction until October 16, 2018 Bicycle/Pedestrian Detour in effect

Last updated today at 7:54am PDT

Between Exit 40: Cataldo (1 mile west of the Pinehurst area) and Exit 45: Silver Valley Road (near Pinehurst). Bridge construction work is in progress. There is work on the shoulder. There are alternating lane closures. Speed limit 45 MPH. Width limit 18'0". Until December 6, 2018 at about 6:00PM PDT.

Web Comment: All ramps and intersections will be open for the weekend, starting the evening of June 22 through approximately 6:00 am June 25, 2018 Coeur D’Alene River Road across the bridge will be closed starting June 25 through June 29, 2018. Use Alternative Route. Westbound on-ramp and off-ramp will be closed starting June 25 through June 29, 2018. Use Alternative Route. Eastbound on-ramp and off-ramp will be closed starting June 26 through June 29, 2018. Use Alternative Route. Bridge construction is on-going. Look for travel lane shifts on I-90. Look for signs.

Last updated today at 3:06pm PDT

Between Exit 67: Mill Street and Lookout Pass (near Mullan). Major road construction work is in progress. The roadway is reduced to one lane. There are temporary lane markings. There is a width limit in effect. Speed restrictions are in force. Speed limit 45 MPH. Width limit 12'0".

Web Comment: Construction limits are Milepost 67.353 to 69.515.

Last updated yesterday at 11:09am PDT