ID 55: Road construction, roadway reduced to one lane, observe signal, look out for flagger, delay, width limit in effect, intersecting road closed. Width limit 11'0". Expect 10 - minute delays.

Between US 95 (1 mile south of the Marsing area) and Sunnyslope Road (near Marsing). Road construction work is in progress. The roadway is reduced to one lane. Observe the signals. Look out for flaggers. Expect delays. There is a width limit in effect. The intersecting road is closed. Width limit 11'0". Expect 10 - minute delays. Until June 15, 2020 at about 7:00PM MDT.

Web Comment: Roadway pulverization and paving scheduled June 26th-July 2nd for both westbound and eastbound lanes from approximately 14th St. to US-95. Paving scheduled June 28th-July 2nd for the north and south portion of Highway 55 from 4th Ave. to approximately 14th St. and both westbound and eastbound lanes from approximately 14th St. to US-95. North half of the bridge new pier construction. Wall construction for new park access west side, north of the bridge.

More Info: Press Release

Last updated today at 11:54am MDT
ID 55: Road construction, paving operation, roadway reduced to one lane, delay, look out for flagger, pilot car in operation, speed restrictions in force, width limit in effect. Expect 15 - minute delays. Speed limit 35 MPH. Width limit 11'0".

Between Sportsman Access and Smith's Ferry Drive - High Valley Road (14 to 20 miles south of the Cascade area). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Expect delays. Look out for flaggers. A pilot car is in operation. Speed restrictions are in force. There is a width limit in effect. Expect 15 - minute delays. Speed limit 35 MPH. Width limit 11'0". From 3:00AM MDT to 8:00PM MDT on Monday, Tuesday, Wednesday and Thursday. Until Friday, at about 11:59PM MDT.

Web Comment: Crews are not allowed to work during the weekends to minimize impacts on traffic. When work is being performed, traffic will be limited to one-lane operations with flaggers and a pilot car. Expect delays of up to 15 minutes.

Last updated today at 8:34am MDT
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on ID 55
Map of Reports on ID 55 Between US 95 (1 mile south of the Marsing area) and Sunnyslope Road (near Marsing). Road construction work is in progress. The roadway is reduced to one lane. Observe the signals. Look out for flaggers. Expect delays. There is a width limit in effect. The intersecting road is closed. Width limit 11'0". Expect 10 - minute delays. Until June 15, 2020 at about 7:00PM MDT. Between Sportsman Access and Smith's Ferry Drive - High Valley Road (14 to 20 miles south of the Cascade area). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Expect delays. Look out for flaggers. A pilot car is in operation. Speed restrictions are in force. There is a width limit in effect. Expect 15 - minute delays. Speed limit 35 MPH. Width limit 11'0". From 3:00AM MDT to 8:00PM MDT on Monday, Tuesday, Wednesday and Thursday. Until Friday, at about 11:59PM MDT.
ID 55: Road construction, roadway reduced to one lane, observe signal, look out for flagger, delay, width limit in effect, intersecting road closed. Width limit 11'0". Expect 10 - minute delays.
ID 55: Road construction, paving operation, roadway reduced to one lane, delay, look out for flagger, pilot car in operation, speed restrictions in force, width limit in effect. Expect 15 - minute delays. Speed limit 35 MPH. Width limit 11'0".
ID 55: Horseshoe Bend Hill
Horseshoe Bend Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup