Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 55
ID 55: Road construction, roadway reduced to one lane, observe signal, look out for flagger, delay, width limit in effect, intersecting road closed. Width limit 11'0". Expect 10 - minute delays.

Between US 95 (1 mile south of the Marsing area) and Sunnyslope Road (near Marsing). Road construction work is in progress. The roadway is reduced to one lane. Observe the signals. Look out for flaggers. Expect delays. There is a width limit in effect. The intersecting road is closed. Width limit 11'0". Expect 10 - minute delays. Until June 15, 2020 at about 7:00PM MDT.

Web Comment: Various sidewalk, driveways, and approaches on Highway 55. - Pier construction for the north half of the new bridge. - Girder construction for the north half of the new bridge. (Intermittent Full Bridge Closures)** - Wall construction for the new park access on the northwest side of the bridge. ** Full bridge closures will be intermittently conducted during nighttime girder construction activities. This work is anticipated to be conducted between the hours of 10:00 P.M. – 2:00 AM on September 4th & 5th, 2019. Intermittent closures will be approximately 30 minutes.

Last updated on September 12
ID 55: Road closed intermittently, long delay, width limit in effect. Expect 30 - minute delays. Width limit 11'0".

Between US 95 (1 mile south of the Marsing area) and Sunnyslope Road (near Marsing). The road is closed intermittently. Expect long delays. There is a width limit in effect. Expect 30 - minute delays. Width limit 11'0". From 10:00PM MDT to 2:00AM MDT on Monday, Tuesday, Thursday and Friday. Until tomorrow at about 2:00AM MDT.

Web Comment: bridge closures will be intermittently conducted during nighttime bridge girder construction activities. This work is anticipated to be conducted between the hours of 10:00 P.M. – 2:00 AM on the 9th, 13th and 16th of September, 2019. Intermittent closures will be approximately 30 minutes. The bridge will be flagger operated/controlled throughout the girder construction activities. There will also be a single lane closure that will restrict traffic to a single lane for the westbound traffic traveling along Sunny Slope Road (heading toward the bridge and the City of Marsing). This lane closure will run concurrently with the bridge girder construction and will approximately be implemented between the hours of 12:00 P.M. – 2:00 A.M. on the dates specified previously.

Last updated on September 12
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on ID 55
Map of Reports on ID 55 Between US 95 (1 mile south of the Marsing area) and Sunnyslope Road (near Marsing). Road construction work is in progress. The roadway is reduced to one lane. Observe the signals. Look out for flaggers. Expect delays. There is a width limit in effect. The intersecting road is closed. Width limit 11'0". Expect 10 - minute delays. Until June 15, 2020 at about 7:00PM MDT. Between US 95 (1 mile south of the Marsing area) and Sunnyslope Road (near Marsing). The road is closed intermittently. Expect long delays. There is a width limit in effect. Expect 30 - minute delays. Width limit 11'0". From 10:00PM MDT to 2:00AM MDT on Monday, Tuesday, Thursday and Friday. Until tomorrow at about 2:00AM MDT. Between I-84 (Meridian) and US 20 (Boise). Look out for rush hour traffic.
ID 55: Road construction, roadway reduced to one lane, observe signal, look out for flagger, delay, width limit in effect, intersecting road closed. Width limit 11'0". Expect 10 - minute delays.
ID 55: Road closed intermittently, long delay, width limit in effect. Expect 30 - minute delays. Width limit 11'0".
ID 55: Horseshoe Bend Hill
Horseshoe Bend Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations