Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
Truck Restrictions on US 12
US 12

Between Big Canyon Road and Bobbit Bench Road (4 miles west of the Orofino area). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. A pilot car is in operation. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Until September 27, 2019 at about 6:00PM PDT.

Web Comment: Guardrail Work

Last updated today at 4:59pm PDT

Between ID 7 and Greer Grade Road (6 miles east of the Orofino area). Bridge construction work is in progress. Expect delays. There is a width limit in effect. Expect 15 - minute delays. Width limit 11'0". Until October 7, 2019 at about 6:00PM PDT.

Web Comment: Silica fume concrete overlay, silane protective treatment for the bridge curb, joint replacement, Delaware rail retrofit, and painting steel girders. Guardrail and approach work from SH-11 MP 0.01- 0.074 Portable traffic signals will be placed at the intersection of the Greer Bridge and US-12 MP 51.5. Motorists, please yield to the traffic signals, and use caution when traveling through the bridge work zone.

Last updated today at 4:30pm PDT