Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
US 12
US 12 in both directions: Road construction, bridge construction, work on the shoulder, roadway reduced to one lane, delays, look out for flaggers, width limit in effect, height limit in effect.

Between State Highway 13 Business and Harris Ridge Road (1 mile east of the Kooskia area). Road construction work is in progress. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. There is a height limit in effect. Width limit 12'0". Height limit 17'0". Until October 22, 2018 at about 6:00PM PDT.

Web Comment: The existing bridge will be removed and replaced at Milepost 76.8 with a new structure. Project will be completed in two phases and one lane of traffic will be maintained. Temporary Traffic Signals will be used 24 hours per day for the duration of the project to control traffic flow in each direction. Travelling public should expect delays.

Last updated on June 21
US 12 in both directions: Bridge construction, roadway reduced to one lane, look out for flaggers, speed restrictions in force, width limit in effect.

Between Pete King Creek Road and Bald Mountain (44 miles east of the Kooskia area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 25 MPH. Width limit 11'0". Until October 15, 2018 at about 6:00PM PDT.

Web Comment: The existing bridge will be removed and replaced at Milepost 120 with a new structure. Project will be completed in two phases and one lane of traffic will be maintained. Temporary Traffic Signals will be used 24 hours per day for the duration of the project to control traffic flow in each direction. Travelling public should expect delays. Workers present from 7:00AM PDT to 6:00PM PDT on Monday, Tuesday, Wednesday and Thursday until October 15.

Last updated on June 21
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on US 12
Map of Reports on US 12 Between Pete King Creek Road and Bald Mountain (44 miles east of the Kooskia area). Bridge construction work is in progress. The roadway is reduced to one lane. Look out for flaggers. Speed restrictions are in force. There is a width limit in effect. Speed limit 25 MPH. Width limit 11'0". Until October 15, 2018 at about 6:00PM PDT.
US 12 in both directions: Road construction, bridge construction, work on the shoulder, roadway reduced to one lane, delays, look out for flaggers, width limit in effect, height limit in effect.
US 12 in both directions: Bridge construction, roadway reduced to one lane, look out for flaggers, speed restrictions in force, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations