Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
Truck Restrictions on ID 75
ID 75

Between Old Highway 93 (7 miles north of the Shoshone area) and Old Highway 93 (17 miles south of the Bellevue area). Road construction work is in progress. Bridge construction work is in progress. The road is being repaved. A seal coat treatment has been applied. Look out for loose gravel on the roadway. The roadway is reduced to one lane. Look out for flaggers. A pilot car is in operation. Expect delays. Speed restrictions are in force. There is a width limit in effect. Expect 10 - minute delays. Speed limit 35 MPH. Width limit 14'0". Until September 2, 2020 at about 5:00PM MDT.

Web Comment: Plant mix overlay, warranty seal coat, bridge repair and guardrail replacement. Contractor: Western Construction 208-850-2812 Traffic Control: Roundabout Contractors 208-881-1088

Last updated on July 27

Between Prairie Creek Road and King Creek Road (16 to 17 miles north of the Ketchum area). Road construction work is in progress. Bridge construction work is in progress. The roadway is reduced to one lane. Look out for temporary traffic lights. Speed restrictions are in force. There is a width limit in effect. Speed limit 35 MPH. Width limit 11'0". Until October 31, 2020 at about 9:00PM MDT.

Web Comment: Replacing existing bridge structure over the Big Wood River with a new structure. Contractor: Cannon Builders 208-785-6281 Traffic Control: Roadwork Ahead ITD Contact: Brock Dille 208-886-7800

Last updated on July 16

Between Yankee Fork Road and Robinson Bar Road (12 miles north of the Stanley area). There is a width limit in effect. Bridge maintenance work is in progress. The roadway is reduced to one lane. Westbound traffic. The right lane is closed. Short delays are possible. Reduce your speed. Width limit 14'0". Speed limit 35 MPH. Until tomorrow at about 5:00PM MDT.

Web Comment: crews will be drilling on the westbound lane. Temporary traffic signals will be placed to control one way traffic over the Yankee Fork Bridge. American Geotech 208-523-8710 or Chad at roadwork ahead 208-734-4444

Last updated on August 10

Between Robinson Bar Road (15 miles north of the Stanley area) and Slate Creek Road (15 miles south of the Clayton area). Road construction work is in progress. There is a width limit in effect. The roadway is reduced to one lane. There are alternating lane closures. Expect delays. Avalanche control work is in progress. Look out for flaggers. Width limit 14'0". Expect 15 - minute delays. Until August 30, 2020 at about 5:30PM MDT.

Web Comment: WESTERN FEDERAL LANDS IS CONDUCTING AVALANCHE REPAIRS ON THE ROCK WALL IN THE NARROWS. A TRAFFIC SIGNAL WILL BE USED. WESTERN FEDERAL LANDS CONTACT IS HOLLAND DREDGE 202-716-7513 OR brent.dredge@dot.gov Contractor: Rock Supremacy 541-383-7625 Traffic Control: Northwest Traffic Control 203-812-9103

Last updated on July 16