Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-90
I-90 in both directions: Bridge construction, roadway reduced to one lane, width limit in effect, truck restrictions in force, speed restrictions in force.

Between Exit 17: Mullan Road and Exit 28: Crossroad (2 to 5 miles east of the Coeur d'Alene area). Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Truck restrictions are in force. Speed restrictions are in force. Until December 3, 2018 at about 11:45PM PST.

Web Comment: All traffic is crossed over to the EB Structure, with only one lane, each direction. Pay attention to signs. There is a 14 ft width restriction until December 3, 2018 Bicycle/Pedestrian Detour in effect

Last updated on November 2
I-90: Bridge construction, work on the shoulder, alternating lane closure. Speed limit 45 MPH. Width limit 14'0".

Between Exit 40: Cataldo (1 mile west of the Pinehurst area) and Exit 45: Silver Valley Road (near Pinehurst). Bridge construction work is in progress. There is work on the shoulder. There are alternating lane closures. Speed limit 45 MPH. Width limit 14'0". Until December 6, 2018 at about 6:00PM PST.

Web Comment: Coeur D'Alene River Road will be closed to northbound and southbound traffic off and on. Look out for flaggers at the intersections.

Last updated on October 29
I-90: Work on the shoulder. Width limit 18'0".

Between Exit 67: Mill Street and Exit 69: East Mullan (near Mullan). There is work on the shoulder. Width limit 18'0". Until Friday, at about 5:00PM PST.

Last updated today at 3:14pm PST
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-90
Map of Reports on I-90 Between Exit 17: Mullan Road and Exit 28: Crossroad (2 to 5 miles east of the Coeur d'Alene area). Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Truck restrictions are in force. Speed restrictions are in force. Until December 3, 2018 at about 11:45PM PST. Between Exit 40: Cataldo (1 mile west of the Pinehurst area) and Exit 45: Silver Valley Road (near Pinehurst). Bridge construction work is in progress. There is work on the shoulder. There are alternating lane closures. Speed limit 45 MPH. Width limit 14'0". Until December 6, 2018 at about 6:00PM PST. Between Exit 67: Mill Street and Exit 69: East Mullan (near Mullan). There is work on the shoulder. Width limit 18'0". Until Friday, at about 5:00PM PST.
I-90 in both directions: Bridge construction, roadway reduced to one lane, width limit in effect, truck restrictions in force, speed restrictions in force.
I-90: Bridge construction, work on the shoulder, alternating lane closure. Speed limit 45 MPH. Width limit 14'0".
I-90: Work on the shoulder. Width limit 18'0".
I-90: Lookout Pass
Huetter Weigh Station
Haugan Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations