Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
I-90
I-90 eastbound: Construction work, width limit in effect.

Between Eastbound Huetter Rest Area (near Post Falls) and Exit 15: Sherman Avenue (Coeur d'Alene). Look out for construction work. There is a width limit in effect. Until October 31, 2018 at about 11:59PM PDT.

Web Comment: Eastbound traffic has two lanes which will now allow wide loads. Any load over 13' must travel through between the hours of 10pm to 6am due to construction work.

Last updated on October 19
I-90 westbound: Construction work, narrow lane, width limit in effect. Width limit 11'0".

Between Exit 15: Sherman Avenue (Coeur d'Alene) and Westbound Huetter Rest Area (near Post Falls). Look out for construction work. Be aware of narrow lanes. There is a width limit in effect. Width limit 11'0". Until October 31, 2018 at about 11:59PM PDT.

Web Comment: Starting 9/15, westbound traffic will be shifted into the middle two lanes. The entrance ramp and exit ramp for 4th Street (Exit 13) will be closed until 10/19. There will be two, separated 11' lanes. Maximum truck load width of 11'. Over width trucks must use the alternate city route via 15th street exit to Appleway Avenue and the Northwest Boulevard entrance ramp. Wide loads over 13' that use the alternate city route must go through between the hours of 10pm and 6am.

Last updated on October 19
I-90 in both directions: Bridge construction, roadway reduced to one lane, width limit in effect, truck restrictions in force, speed restrictions in force.

Between Exit 17: Mullan Road and Exit 28: Crossroad (2 to 5 miles east of the Coeur d'Alene area). Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Truck restrictions are in force. Speed restrictions are in force. Until December 3, 2018 at about 11:45PM PDT.

Web Comment: All traffic is crossed over to the EB Structure, with only one lane, each direction. Pay attention to signs. There is a 14 ft width restriction until December 3, 2018 Bicycle/Pedestrian Detour in effect

Last updated on October 19
I-90: Bridge construction, work on the shoulder, alternating lane closure. Speed limit 45 MPH. Width limit 14'0".

Between Exit 40: Cataldo (1 mile west of the Pinehurst area) and Exit 45: Silver Valley Road (near Pinehurst). Bridge construction work is in progress. There is work on the shoulder. There are alternating lane closures. Speed limit 45 MPH. Width limit 14'0". Until December 6, 2018 at about 6:00PM PDT.

Web Comment: Coeur D'Alene River Road will be closed to northbound and southbound traffic off and on until final paving has finished on October 25, 2018 and then will be restricted to one lane alternating traffic when open. Look out for traffic signals and flaggers at the intersections. Expect the Westbound off ramp to be closed and reopened on a gravel surface, motorcycles use caution.

Last updated on October 17
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-90
Map of Reports on I-90 Between Eastbound Huetter Rest Area (near Post Falls) and Exit 15: Sherman Avenue (Coeur d'Alene). Look out for construction work. There is a width limit in effect. Until October 31, 2018 at about 11:59PM PDT. Between Exit 15: Sherman Avenue (Coeur d'Alene) and Westbound Huetter Rest Area (near Post Falls). Look out for construction work. Be aware of narrow lanes. There is a width limit in effect. Width limit 11'0". Until October 31, 2018 at about 11:59PM PDT. Between Exit 17: Mullan Road and Exit 28: Crossroad (2 to 5 miles east of the Coeur d'Alene area). Bridge construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Truck restrictions are in force. Speed restrictions are in force. Until December 3, 2018 at about 11:45PM PDT. Between Exit 40: Cataldo (1 mile west of the Pinehurst area) and Exit 45: Silver Valley Road (near Pinehurst). Bridge construction work is in progress. There is work on the shoulder. There are alternating lane closures. Speed limit 45 MPH. Width limit 14'0". Until December 6, 2018 at about 6:00PM PDT. Between Exit 45: Silver Valley Road and Exit 40: Cataldo (near Pinehurst). Road construction work is in progress. The exit ramp is closed because the road is being repaved. Until Wednesday, at about 5:00PM PDT.
I-90 eastbound: Construction work, width limit in effect.
I-90 westbound: Construction work, narrow lane, width limit in effect. Width limit 11'0".
I-90 in both directions: Bridge construction, roadway reduced to one lane, width limit in effect, truck restrictions in force, speed restrictions in force.
I-90: Bridge construction, work on the shoulder, alternating lane closure. Speed limit 45 MPH. Width limit 14'0".
I-90: Lookout Pass
Huetter Weigh Station
Haugan Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations