Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
ID 3
ID 3 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, width limit in effect. Width limit 11'6".

Between Sanderson Lane and Wood Creek Road (3 miles north of the Bovill area). Road construction work is in progress. The road is being repaved. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. There is a width limit in effect. Width limit 11'6". Until October 30, 2020 at about 5:00PM PDT.

Web Comment: Bridge replacement traffic control will be stop, yield, proceed with caution. Motorists should drive with extreme caution as there will be single lane yield traffic control during this project.

Last updated yesterday at 1:10pm PDT
ID 3 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, look out for flagger, width limit in effect. Width limit 12'0". Expect 15 - minute delays.

Between Poplar Road and Staples Creek Road (17 miles north of the Bovill area). Road construction work is in progress. The road is being repaved. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 15 - minute delays. Until October 31, 2020 at about 8:00PM PDT.

Web Comment: Full Bridge Replacement

Last updated yesterday at 1:13pm PDT
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on ID 3
Map of Reports on ID 3 Between Sanderson Lane and Wood Creek Road (3 miles north of the Bovill area). Road construction work is in progress. The road is being repaved. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. There is a width limit in effect. Width limit 11'6". Until October 30, 2020 at about 5:00PM PDT.
ID 3 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, width limit in effect. Width limit 11'6".
ID 3 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, look out for flagger, width limit in effect. Width limit 12'0". Expect 15 - minute delays.
ID 3: Kendrick
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations