Between Frontage Road and Main Street and West Boulevard (near Jerome). There is a width limit in effect. Road construction work is in progress. The road is being repaved. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to two lanes. The right lane is closed. The left lane is closed. Look out for flaggers. A detour is in operation. Reduce your speed. Speed limit 35 MPH. Width limit 12'6". Until May 28, 2021 at about 5:00PM MST.
Web Comment: Road and Bridgework on US 25 in both directions between MP 0.49 and 0.51 from 11/2/2020 to 5/28/2021. 35 mph speed limit. The roadway is reduced to two lanes. Look out for flaggers. A detour is in operation.
Last updated on January 6