Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 11
ID 11 in both directions: Bridge construction, delay, width limit in effect. Expect 15 - minute delays. Width limit 11'0".

Between US 12 and Woodland Grade Road (16 miles south of the Weippe area). Bridge construction work is in progress. Expect delays. There is a width limit in effect. Expect 15 - minute delays. Width limit 11'0". Until October 7, 2019 at about 6:00PM PDT.

Web Comment: Silica fume concrete overlay, silane protective treatment for the bridge curb, joint replacement, Delaware rail retrofit, and painting steel girders. Guardrail and approach work from SH-11 MP 0.01- 0.074 Portable traffic signals will be placed at the intersection of the Greer Bridge and US-12 MP 51.5. Motorists, please yield to the traffic signals, and use caution when traveling through the bridge work zone

Last updated on August 21
ID 11 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, look out for flagger, width limit in effect. Expect 15 - minute delays. Width limit 11'0".

Between Mill Road and Green Road (3 miles south of the Weippe area). Road construction work is in progress. The road is being repaved. Bridge construction work is in progress. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. Expect 15 - minute delays. Width limit 11'0". Until November 18, 2019 at about 8:00PM PDT.

Web Comment: The project will consist of grinding out areas where the plantmix is distressed and replacing with new plantmix. Transverse cracks will be routed and filled and the entire road surface will have a smoothness grind and overlay. Signs, sign posts and delineators will be replaced in their existing locations. Pavement markings will be repainted by contractor.

Last updated on September 10
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on ID 11
Map of Reports on ID 11 Between US 12 and Woodland Grade Road (16 miles south of the Weippe area). Bridge construction work is in progress. Expect delays. There is a width limit in effect. Expect 15 - minute delays. Width limit 11'0". Until October 7, 2019 at about 6:00PM PDT.
ID 11 in both directions: Bridge construction, delay, width limit in effect. Expect 15 - minute delays. Width limit 11'0".
ID 11 in both directions: Road construction, paving operation, bridge construction, work on the shoulder, roadway reduced to one lane, delay, look out for flagger, width limit in effect. Expect 15 - minute delays. Width limit 11'0".
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations