Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
I-84
I-84: Road construction, roadway reduced to one lane, speed restrictions in force, width limit in effect, delay, paving operation, work on the shoulder, bridge construction. Speed limit 55 MPH. Expect 10 - minute delays. Width limit 12'0".

Between US 20 and Exit 38: I-84B Nampa; Garrity Blvd (near Nampa). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Expect delays. The road is being repaved. There is work on the shoulder. Bridge construction work is in progress. Speed limit 55 MPH. Expect 10 - minute delays. Width limit 12'0". From 9:00PM MST to 5:00AM MST daily. Until January 28, 2021 at about 6:00AM MST.

Web Comment: WIDTH LIMIT IS AT NIGHT ONLY. the width limit at night is 12'. (9 pm to 7 am) Expect night time lane closures through the duration of the project. Expect nightly lane closures on Northside Blvd in November. Flaggers may be present to control traffic on Northside. Lane restrictions will be in place on the Franklin Blvd overpass on Friday and Saturday, 11/20 and 11/21. Southbound traffic will be reduced down to a single lane on Franklin Blvd from 8am-3pm.

Last updated today at 7:59am MST
I-84: Road construction, roadway reduced to one lane, width limit in effect, speed restrictions in force. Speed limit 70 MPH. Width limit 14'0".

Between Exit 112 (5 miles west of the Glenns Ferry area) and Exit 125: 18th East Street (near Glenns Ferry). Road construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Speed restrictions are in force. Speed limit 70 MPH. Width limit 14'0". Until Friday, at about 11:59PM MST.

Web Comment: plan on crossing traffic back to east and west bound lanes on November 13th

Last updated on November 17
I-84 westbound: Truck restrictions in force, on the off ramp. Width limit 12'6".

At I-84B Glenns Ferry (near Glenns Ferry). Truck restrictions are in force. On the off ramp. Width limit 12'6". Until Friday, at about 11:59PM MST.

Web Comment: there is a 12.5' width restrictions for WB Exit 121 traffic for work over the Snake River bridge.

Last updated on November 19
I-84 in both directions: Road construction, paving operation, roadway reduced to two lane, follow the sign, speed restrictions in force, width limit in effect. Speed limit 70 MPH. Width limit 12'0".

Between ID 77; ID 25 and ID 81 Spur (10 to 12 miles east of the Heyburn area). Road construction work is in progress. The road is being repaved. The roadway is reduced to two lanes. Follow the signs. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until November 30, 2020 at about 8:00PM MST.

Web Comment: Westbound lanes will be closed. Traffic will be moved via crossovers into the eastbound lanes creating one eastbound and one westbound lane. DMS signs will be in operation. Traffic Control and Contractor: Wadsworth Brothers Const.

Last updated on October 29
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-84
Map of Reports on I-84 Between Exit 28: 10th Street (Caldwell) and Exit 35: Northside Boulevard (Nampa). Look out for rush hour traffic. Between US 20 and Exit 38: I-84B Nampa; Garrity Blvd (near Nampa). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Expect delays. The road is being repaved. There is work on the shoulder. Bridge construction work is in progress. Speed limit 55 MPH. Expect 10 - minute delays. Width limit 12'0". From 9:00PM MST to 5:00AM MST daily. Until January 28, 2021 at about 6:00AM MST. Between Exit 36 (Nampa) and Exit 44 (near Meridian). Look out for rush hour traffic. Between Exit 112 (5 miles west of the Glenns Ferry area) and Exit 125: 18th East Street (near Glenns Ferry). Road construction work is in progress. The roadway is reduced to one lane. There is a width limit in effect. Speed restrictions are in force. Speed limit 70 MPH. Width limit 14'0". Until Friday, at about 11:59PM MST. Between ID 77; ID 25 and ID 81 Spur (10 to 12 miles east of the Heyburn area). Road construction work is in progress. The road is being repaved. The roadway is reduced to two lanes. Follow the signs. Speed restrictions are in force. There is a width limit in effect. Speed limit 70 MPH. Width limit 12'0". Until November 30, 2020 at about 8:00PM MST.
I-84: Road construction, roadway reduced to one lane, speed restrictions in force, width limit in effect, delay, paving operation, work on the shoulder, bridge construction. Speed limit 55 MPH. Expect 10 - minute delays. Width limit 12'0".
I-84: Road construction, roadway reduced to one lane, width limit in effect, speed restrictions in force. Speed limit 70 MPH. Width limit 14'0".
I-84 westbound: Truck restrictions in force, on the off ramp. Width limit 12'6".
I-84 in both directions: Road construction, paving operation, roadway reduced to two lane, follow the sign, speed restrictions in force, width limit in effect. Speed limit 70 MPH. Width limit 12'0".
East Boise Weigh Station
Cotterell Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations