Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
ID 55
ID 55: Road construction, roadway reduced to one lane, observe signal, look out for flagger, delay, width limit in effect. Expect 5 - minute delays. Width limit 11'0".

Between US 95 (1 mile south of the Marsing area) and Sunnyslope Road (near Marsing). Road construction work is in progress. The roadway is reduced to one lane. Observe the signals. Look out for flaggers. Expect delays. There is a width limit in effect. Expect 5 - minute delays. Width limit 11'0". Until June 15, 2020 at about 7:00PM MDT.

Web Comment: Roadway Base preparation, on the South side of Highway 55, from Riverfront Dr. to 3rd Ave W. Roadway excavation/widening, on the North side of Highway 55, from 4th Ave. W to 14 St. Storm Sewer pipe placement from 4th Ave. W to just past 14th St.

More Info: Press Release

Last updated today at 5:54pm MDT
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on ID 55
Map of Reports on ID 55 Between US 95 (1 mile south of the Marsing area) and Sunnyslope Road (near Marsing). Road construction work is in progress. The roadway is reduced to one lane. Observe the signals. Look out for flaggers. Expect delays. There is a width limit in effect. Expect 5 - minute delays. Width limit 11'0". Until June 15, 2020 at about 7:00PM MDT. Between Sportsman Access and Smith's Ferry Drive - High Valley Road (14 to 20 miles south of the Cascade area). Look out for potholes. Drive carefully.
ID 55: Road construction, roadway reduced to one lane, observe signal, look out for flagger, delay, width limit in effect. Expect 5 - minute delays. Width limit 11'0".
ID 55: Horseshoe Bend Hill
Horseshoe Bend Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations