Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW & give us feedback.
I-84
I-84: Road construction, roadway reduced to one lane, speed restrictions in force, width limit in effect, delay, paving operation, work on the shoulder, bridge construction. Speed limit 55 MPH. Expect 10 - minute delays. Width limit 12'0".

Between US 20 and Exit 38: I-84B Nampa; Garrity Blvd (near Nampa). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Expect delays. The road is being repaved. There is work on the shoulder. Bridge construction work is in progress. Speed limit 55 MPH. Expect 10 - minute delays. Width limit 12'0". From 9:00PM MST to 5:00AM MST daily. Until January 28, 2021 at about 6:00AM MST.

Web Comment: WIDTH LIMIT IS AT NIGHT ONLY. the width limit at night is 12'. (9 pm to 7 am) Expect night time lane closures through the duration of the project. Expect nightly lane closures on Northside Blvd in November and December. Flaggers may be present to control traffic on Northside.

Last updated today at 6:45pm MST
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-84
Map of Reports on I-84 Between Exit 28: 10th Street (Caldwell) and Exit 35: Northside Boulevard (Nampa). Look out for rush hour traffic. Between US 20 and Exit 38: I-84B Nampa; Garrity Blvd (near Nampa). Road construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. There is a width limit in effect. Expect delays. The road is being repaved. There is work on the shoulder. Bridge construction work is in progress. Speed limit 55 MPH. Expect 10 - minute delays. Width limit 12'0". From 9:00PM MST to 5:00AM MST daily. Until January 28, 2021 at about 6:00AM MST. Between Exit 36 (Nampa) and Exit 44 (near Meridian). Look out for rush hour traffic. Between Exit 38: I-84B Nampa; Garrity Blvd and Exit 42: Ten Mile Rd (near Nampa). Utility work is in progress. The roadway is reduced to one lane. From 10:00PM MST to 5:00AM MST on Monday and Tuesday. Until tomorrow at about 5:00AM MST.
I-84: Road construction, roadway reduced to one lane, speed restrictions in force, width limit in effect, delay, paving operation, work on the shoulder, bridge construction. Speed limit 55 MPH. Expect 10 - minute delays. Width limit 12'0".
East Boise Weigh Station
Cotterell Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations