I-90
I-90 westbound: Long term road construction, bridge construction, lane closed, width limit in effect, traffic congestion. Speed limit 55 MPH. Width limit 13'0".

Between Exit 15: Sherman Avenue and Exit 13: 4th Street (Coeur d'Alene). Look out for long term road construction work. Bridge construction work is in progress. A lane is closed. There is a width limit in effect. Look out for traffic congestion. Speed limit 55 MPH. Width limit 13'0". Until September 29, 2020 at about 5:30PM PDT.

Web Comment: Work to replace the Pennsylvania Ave bridges begins in March. For more details visit itdprojects.org/i90pennsylvania.

Last updated on July 17
I-90 eastbound: Long term road construction, bridge construction, lane closed, traffic congestion, width limit in effect. Speed limit 55 MPH.

Between Exit 14: 15th Street and Exit 15: Sherman Avenue (Coeur d'Alene). Look out for long term road construction work. Bridge construction work is in progress. A lane is closed. Look out for traffic congestion. There is a width limit in effect. Speed limit 55 MPH. Until September 29, 2020 at about 5:30PM PDT.

Web Comment: Work to replace the Pennsylvania Ave bridges. For more details visit itdprojects.org/i90pennsylvania. Width restriction is 19'.

Last updated on July 30
I-90 westbound: Entrance ramp closed, see map for detour(s).

At Exit 15: Sherman Avenue (Coeur d'Alene). The entrance ramp is closed. Until September 29, 2020 at about 11:59PM PDT.

Web Comment: WB Sherman on ramp closed until October for Penn Ave Bridge Replacement. For more details visit itdprojects.org/i90pennsylvania

Last updated on July 2
I-90 in both directions: Bridge construction, road construction, roadway reduced to one lane. Speed limit 55 MPH. Width limit 14'0".

Between Exit 17: Mullan Road and Exit 22: ID 97 (2 to 5 miles east of the Coeur d'Alene area). Bridge construction work is in progress. Road construction work is in progress. The roadway is reduced to one lane. Speed limit 55 MPH. Width limit 14'0". Until August 31, 2020 at about 7:00PM PDT.

Web Comment: Median cross-over is in use. All traffic is on the eastbound bridge so work on the westbound bridge can take place. Traffic is reduced to one lane each direction for the duration of the work. Watch for backed up traffic, and expect some delays.

Last updated on August 9
I-90 in both directions: Lane closed, because of road maintenance activitie. Width limit 13'0".

Between Exit 69: East Mullan (near Mullan) and The Montana State Line (4 miles east of the Mullan area). A lane is closed because of road maintenance activities. Width limit 13'0". Until September 3, 2020 at about 6:00PM PDT.

Last updated on August 11
Switch to Winter Driving Conditions
Switch to Road Reports
Truck Restrictions on I-90
Map of Reports on I-90 Between Exit 15: Sherman Avenue and Exit 13: 4th Street (Coeur d'Alene). Look out for long term road construction work. Bridge construction work is in progress. A lane is closed. There is a width limit in effect. Look out for traffic congestion. Speed limit 55 MPH. Width limit 13'0". Until September 29, 2020 at about 5:30PM PDT. Between Exit 14: 15th Street and Exit 15: Sherman Avenue (Coeur d'Alene). Look out for long term road construction work. Bridge construction work is in progress. A lane is closed. Look out for traffic congestion. There is a width limit in effect. Speed limit 55 MPH. Until September 29, 2020 at about 5:30PM PDT. Between Exit 17: Mullan Road and Exit 22: ID 97 (2 to 5 miles east of the Coeur d'Alene area). Bridge construction work is in progress. Road construction work is in progress. The roadway is reduced to one lane. Speed limit 55 MPH. Width limit 14'0". Until August 31, 2020 at about 7:00PM PDT. Between Exit 69: East Mullan (near Mullan) and The Montana State Line (4 miles east of the Mullan area). A lane is closed because of road maintenance activities. Width limit 13'0". Until September 3, 2020 at about 6:00PM PDT.
I-90 westbound: Long term road construction, bridge construction, lane closed, width limit in effect, traffic congestion. Speed limit 55 MPH. Width limit 13'0".
I-90 eastbound: Long term road construction, bridge construction, lane closed, traffic congestion, width limit in effect. Speed limit 55 MPH.
I-90 westbound: Entrance ramp closed, see map for detour(s).
I-90 in both directions: Bridge construction, road construction, roadway reduced to one lane. Speed limit 55 MPH. Width limit 14'0".
I-90 in both directions: Lane closed, because of road maintenance activitie. Width limit 13'0".
I-90: Lookout Pass
Huetter Weigh Station
Haugan Weigh Station
Google Static Map Image
Closure Closure Restriction Restriction Spring Breakup Spring Breakup
Truck Ramp Truck Ramp Weigh Station Weigh Stations