Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW!
Truck Restrictions on US 30
US 30

Between 1350 East Road (near Buhl) and 2100 East Road (near Filer). Road construction work is in progress. The road is being repaved. The roadway is reduced to one lane. Reduce your speed. There is a width limit in effect. Look out for flaggers. A pilot car is in operation. A seal coat treatment has been applied. Look out for loose gravel on the roadway. Speed limit 40 MPH. Width limit 14'0". Until June 30, 2021 at about 7:00PM MDT.

Web Comment: The roadway is being repaved with chip sealing to occur when paving is complete. Use caution around crews and equipment.

Last updated on May 27

Between Main Street - Hawthorne Road and Cedar Street (Pocatello). There is a height limit in effect. Height limit 13'7".

Web Comment: There is a permanent height restriction within the city limits of Pocatello, affecting both eastbound and westbound travel.

Last updated on May 21

Between Main Street - Hawthorne Road and Cedar Street (Pocatello). There is a height limit in effect. Height limit 13'5".

Web Comment: This is a permanent height restriction within the city limits of Pocatello, in both east and westbound lanes, at the railroad bridge on Garret Way, between Main Street and Cedar Street, at milepost 334.15.

Last updated on May 21