Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW!
Truck Restrictions on US 95
US 95

Between Toney Lane and Salubria Road (near Cambridge). There is a width limit in effect. There is a height limit in effect. The roadway is reduced to one lane. Bridge construction work is in progress. Expect delays. There is work on the shoulder. Width limit 12'0". Expect 10 - minute delays. Until November 30, 2021 at about 11:59PM MDT.

Web Comment: Expect 10 minutes delays. Restricted to one lane starting 4/29. Width restriction of 12' will take affect on 5/3/2021. Traffic is controlled with temporary signals. Minimum vertical height clearance of 40 inches required to clear bridge rail. UPDATE: 6/30/21 Wednesday through 7/1/21 Thursday for Girder Placement. Expect intermittent delays of up to 30 minutes three to four times per day.

Last updated on June 21

Between Hot Springs Road and The Little Salmon River Bridge (near New Meadows). Road construction work is in progress. The road is being repaved. Look out for bridge demolition work due to bridge construction work. The roadway is reduced to one lane. Expect delays. There is a width limit in effect. Width limit 14'0". Until November 8, 2021 at about 5:00PM MDT.

Last updated on June 18

Between McBride Road and East Cove Road (11 to 12 miles north of the Moscow area). Road construction work is in progress. The road is being repaved. There is work on the shoulder. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. Expect 15 - minute delays. Width limit 12'0". Until August 30, 2021 at about 6:00PM PDT.

Web Comment: Motorists are urged to exercise caution as workers and equipment will operating close to traffic on both sides of the roadway.

Last updated yesterday at 1:54pm PDT

Between 1st Street and Granite-Kelso Cut-Off Road (4 miles north of the Athol area). Road construction work is in progress due to road work. The right lane is closed. Speed limit 55 MPH. Width limit 16'0". From 6:00AM PDT to 4:30PM PDT on weekdays. Until December 31, 2022 at about 5:00PM PDT.

Web Comment: Adding a Right lane Closure intermittently as work needs it. Reconstruction of US-95 and Frontage roads. Most work will occur off alignment for building the East side Frontage Road. Once complete US-95 Traffic will be crossed over onto the newly built frontage road until mainline and the west side frontage road is complete. Scheduled for two years of construction. The week of 05-03-2021 and forward, Old house road will be detoured around construction and up to Mara Meadows on a gravel road. Motorcycles use caution.

Last updated on May 21