Idaho Transportation Department Logo Idaho Transportation Department   Highway Info
This website will transition to a NEW 511 site. Start using it NOW!
Truck Restrictions on US 12
US 12

Between ID 3 and Coyote Gulch Road (26 miles west of the Orofino area). Road construction work is in progress. Bridge maintenance work is in progress. The roadway is reduced to one lane. Expect delays. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Expect 15 - minute delays. Until tomorrow at about 6:00PM PDT.

Web Comment: Bridge deck epoxy overlay. Travel lanes will be restricted to 12' width. For wide load accommodations contact the project's Traffic Control Supervisor Tina Lee at 509-608-7492. Motorists are urged to exercise caution when traveling in the area as workers and equipment will be working both sides of the roadway.

Last updated yesterday at 8:40am PDT

Between Magpie Road and Amos Beach Road (18 to 19 miles west of the Orofino area). Road construction work is in progress. There is work on the shoulder. The roadway is reduced to two lanes. Reduce your speed. There is a width limit in effect. Advisory speed limit 45 MPH. Width limit 12'0". Until May 14, 2021 at about 5:00AM PDT.

Web Comment: Road construction work on the east bound lane of US-12 from milepost 20.93 to milepost 21.23. This work is in preparation to replace the existing Cherry Lane Bridge, including improvements to roadway approaches and widening US-12 from MP 20.93 to MP 21.23. Motorists are urged to exercise caution when traveling in the area, as workers and equipment will be working close to traffic.

Last updated yesterday at 8:35am PDT